Home › Glossary
Construction glossary
Plain-English definitions of the words that show up in construction contracts, meetings and paperwork. Each term has a short definition, an example from a real kind of job, the mistakes people make with it, and the terms it is often confused with.
All terms
Terms are grouped by where you meet them on a job.
Project paperwork
- Addendum: An addendum is a written change or clarification to the bid documents issued before the contract is signed. Example, common mistakes, related terms.
- As-built drawings: As-built drawings are the plans marked up to show how the work was really installed. See an example, common mistakes and related closeout terms.
- ASI: An ASI (architect's supplemental instruction) is a written minor change or clarification that does not change price or time. Example and mistakes.
- Ball in court: Ball in court names the person or company that has to act next on an RFI, submittal or other open item. Example, common mistakes, related terms.
- Daily report: A construction daily report records each day on site: weather, crews, hours, work done, deliveries and delays. Example, mistakes and related terms.
- RFI (request for information): An RFI (request for information) is a written question about the drawings or specs. See an example, common mistakes and how RFIs are tracked.
- RFI log: An RFI log is the running list of every request for information on a project, with dates, status and who has to answer. Example and common mistakes.
- Submittal: A submittal is a package the contractor sends for approval before buying or building: shop drawings, product data or samples. Example and mistakes.
- Submittal log: A submittal log, or submittal register, lists every required submittal with its spec section, dates and status. Example, mistakes and related terms.
- Transmittal: A transmittal is a cover sheet that records what documents were sent, to whom, when and why. See an example, common mistakes and related terms.
Billing and contracts
- Allowance: An allowance is a set amount in the contract price for an item that is not fully chosen yet. See an example, common mistakes and related terms.
- Backcharge: A backcharge is a cost one party deducts from another, usually a GC from a subcontractor, for damage, cleanup or corrective work. Example and mistakes.
- Certificate of insurance (COI): A certificate of insurance is a one-page summary of a contractor’s insurance coverage, limits and dates. Example, common mistakes, related terms.
- Change order: A change order is a signed agreement that changes the contract scope, price or time. See an example, common mistakes and how change orders are tracked.
- Lien waiver: A lien waiver is a signed document giving up the right to file a lien for a payment. Learn the four common types, an example and common mistakes.
- Lump sum contract: A lump sum contract sets one fixed price for a defined scope of work. See an example, common mistakes, and how it differs from unit price work.
- Pay application: A pay application is the contractor’s periodic request for payment, based on work completed against the schedule of values. Example and mistakes.
- Retainage: Retainage is a share of each progress payment held back until the work is finished. See an example, common mistakes and how retainage is tracked.
- Schedule of values: A schedule of values breaks the contract price into line items that add up to the total and is used to bill each month. Example and common mistakes.
- T&M ticket: A T&M ticket records the labor hours, materials and equipment used on extra work, signed in the field the same day. Example and common mistakes.
- Unit price contract: In a unit price contract the contractor is paid a set price per unit of work, multiplied by the measured quantity. Example and common mistakes.
- W-9: A W-9 is the IRS form a subcontractor or vendor fills out to give its legal name and taxpayer ID to the company paying it. Example and mistakes.
Cost and job costing
- Committed cost: Committed cost is money a job has promised to spend through purchase orders and subcontracts but has not yet been billed. Example and mistakes.
- Cost code: A cost code is a short code that sorts every job cost into a category of work, so budget and actual cost can be compared. Example and mistakes.
- Cost to complete: Cost to complete is the estimate of what a job still has to spend to finish. See how it is worked out, an example and the common mistakes.
- WIP report: A WIP (work in progress) report compares each open job’s cost, billing and earned revenue to show over- and under-billing. Example and mistakes.
Safety
- Competent person: A competent person can spot hazards and has the authority to fix them at once. See what the term means, an example and common mistakes.
- JHA (job hazard analysis): A JHA, or job hazard analysis, breaks a task into steps and lists the hazards and controls for each. See an example, common mistakes and related terms.
- Lockout/tagout (LOTO): Lockout/tagout is the practice of shutting off and locking energy sources before servicing equipment, so it cannot start by accident. Example and mistakes.
- Safety data sheet (SDS): A safety data sheet (SDS) is the manufacturer’s 16-section document on a chemical product’s hazards, handling and first aid. Example and mistakes.
- Toolbox talk: A toolbox talk is a short safety meeting held with the crew on site, usually on one topic, with a sign-in sheet. Example, mistakes, related terms.
- TRIR: TRIR is the number of OSHA recordable injuries per 100 full-time workers in a year. See the formula, a worked example and common mistakes.
Schedule and closeout
- Closeout: Closeout is the last phase of a construction project: finishing the punch list, handing over documents and getting final payment. Example and mistakes.
- Critical path: The critical path is the longest chain of linked activities in a schedule. A delay to any of them delays the finish date. Example and mistakes.
- Look-ahead schedule: A look-ahead schedule is a short-term plan of the next two to six weeks of work, by day and by crew. Example, common mistakes and related terms.
- O&M manual: An O&M (operation and maintenance) manual gives the owner the instructions, schedules and warranties for the building’s equipment. Example and mistakes.
- Punch list: A punch list is the list of small items that must be fixed or finished before a job is accepted as complete. Example, mistakes and related terms.
- Substantial completion: Substantial completion is the point when a project is finished enough for the owner to use it as intended. Example, common mistakes, related terms.
- Warranty walk: A warranty walk is an inspection held before the warranty period ends, to list defects the contractor must fix. Example, mistakes, related terms.
Time and payroll
- Certified payroll: Certified payroll is a weekly payroll report, signed as true, that contractors submit on prevailing wage projects. A plain definition and example.
- Geofence: A geofence is a virtual boundary drawn around a jobsite on a map, used to check that crew clock in and out on site. Example and common mistakes.
- Prevailing wage: Prevailing wage is the minimum hourly wage and benefits that must be paid to each trade on covered public construction projects. Plain definition.
Who this glossary is for
It is for the new project engineer who hears ten new words in the first owner meeting, the foreman who was just asked for a JHA, and the office manager who has to send a pay application for the first time. It is also a quick check for experienced people who want to explain a term to someone else without a lecture.
The definitions describe how the words are normally used on commercial construction jobs in the United States. Your contract can define a word differently, and when it does, the contract wins. Nothing here is legal, tax or accounting advice.
From the word to the work
Knowing the word is the first step. The guides show how to do the paperwork behind it, and the free templates give you forms to print. If you want to see how a term works inside software, the feature guide has a page for each Trakend tool.
Frequently asked questions
Are these legal definitions?
No. They are general explanations of how the terms are commonly used. Your contract, your state's laws and your own advisors decide what a term means on your job.
Why do some terms mention Trakend?
Where a term matches a tool in Trakend, the page says how it shows up there. Where Trakend does not handle something, the page says that too.
Can I suggest a term?
Yes. Email [email protected] with the term you want explained.
Related
- Guides: Plain-English guides to construction paperwork: daily reports, toolbox talks, JHAs, RFIs and submittals, pay applications, change orders and T&M.
- Free templates: Free construction templates you can read, print and use today: toolbox talks with sign-in sheets and JHA templates with job steps, hazards and controls.
- Feature guide: A page for every Trakend tool: safety, field paperwork, time clock, documents, billing, subcontractors, equipment and company settings.
- All features: Every Trakend feature: daily reports, safety, plans, RFIs and submittals, scheduling, time clock, change orders and pay apps. All on every plan.
Start a 30-day free trial · Pricing · Features · Free templates · Guides · By trade · By state