Change order
A change order is a written, signed agreement that changes a construction contract after it has been signed. It can add or remove work, change the price, change the completion date, or all three.
Last updated
What a change order is
Almost every job changes. The owner wants something different, the drawings have a gap, or the ground hides a surprise. The change order is how that change becomes official. It describes the changed work, states the amount added to or taken off the contract, states any added days, and is signed by the parties.
There are two levels. The owner signs change orders with the general contractor. The general contractor signs change orders with its subcontractors. A change that adds money is an add. One that removes money is a deduct. Until a change order is signed, the contractor is usually working at risk.
A change order on a real job
During demolition in an office remodel, the crew finds an old floor safe set in the slab where a new plumbing trench has to go. Removing it is not in anyone's scope. The general contractor prices two workers for a day, a saw rental and disposal, adds the overhead and profit allowed by the contract, and sends the price to the owner. The owner signs. The amount is added to the contract and billed on the next pay application.
Common mistakes with change orders
- Doing the extra work on a verbal okay and trying to get it signed afterward.
- Missing the notice deadline in the contract for claiming extra cost or time.
- Pricing the cost but forgetting to ask for the extra days.
- Sending a price with no backup, such as labor hours, material quotes and photos.
- Getting the change approved and then never adding it to the billing.
Change orders in Trakend
Trakend keeps two change order logs on each project: the ones you send to the owner and the ones your subcontractors send to you. Each change order has line items, attachments and a status, and markup rules add overhead and profit the way your contract allows. Field-signed T&M tickets can be turned into a change order, and an approved owner change order is added to the next draft pay application as its own line. See change orders.
Related terms
Work tracked by the hour before a price is agreed goes on a T&M ticket. A minor design change with no cost is an ASI. A charge taken from a subcontractor is a backcharge. Approved changes show up on the pay application.
Frequently asked questions
Who signs a change order?
The parties to the contract being changed. For the prime contract that is the owner and the general contractor, often with the architect. For a subcontract it is the general contractor and the subcontractor.
Can a change order reduce the contract?
Yes. A deduct change order removes work and lowers the contract amount.
What is a change order request?
It is the contractor’s priced proposal for a change, sent before the change order is signed. You may also hear it called a COR or a PCO.
Related
- Change orders: Price change orders with your own overhead and profit rules, keep owner and sub change orders in separate logs, and bill them on the next pay app.
- Change order vs T&M ticket: Change order vs T&M ticket: a change order changes the contract price, a T&M ticket records extra work as it happens. How to use both to get paid.
- T&M ticket: A T&M ticket records the labor hours, materials and equipment used on extra work, signed in the field the same day. Example and common mistakes.
- Pay application: A pay application is the contractor’s periodic request for payment, based on work completed against the schedule of values. Example and mistakes.
- Backcharge: A backcharge is a cost one party deducts from another, usually a GC from a subcontractor, for damage, cleanup or corrective work. Example and mistakes.
Start a 30-day free trial · Pricing · Features · Free templates · Guides · By trade · By state