Substantial completion
Substantial completion is the stage when the work is finished enough, under the contract, that the owner can occupy or use the project for its intended purpose. Small items may remain, but the building does its job.
Last updated
What substantial completion means
It is one of the most important dates in a contract, because several things usually hinge on it. The contract time and any charges for late completion are normally measured to this date. Warranty periods often start. Responsibility for utilities, security and insurance commonly shifts to the owner. Much of the retainage may become due. The exact effects are set by each contract.
The date is normally fixed in writing. The contractor says the work is ready, the architect and owner inspect it, and a certificate of substantial completion is signed with the punch list attached. Final completion comes later, when the punch list and closeout paperwork are done.
Substantial completion on a real job
A contractor is building a retail store with a contract completion date of June 1. On May 28 the building inspector issues the certificate of occupancy, the lights and air conditioning work, and the owner's fixtures can be installed. The architect walks the store, lists thirty punch items and signs a certificate of substantial completion dated May 29. The contractor has met the contract date, the one-year warranty starts, and the remaining work is the punch list.
Common mistakes with substantial completion
- Assuming a certificate of occupancy and substantial completion are the same thing. They often arrive together, but one comes from the building department and the other from the contract.
- Not getting the date in writing, then arguing about it when late charges come up.
- Letting the owner move in without recording the condition of the space.
- Losing track of when each warranty started.
- Treating substantial completion as the finish line and letting closeout drag on for months.
Substantial completion and Trakend
Trakend does not issue a certificate of substantial completion. That is a contract document between the owner, the architect and the contractor. What Trakend holds is the record around it: the schedule milestone, the punch list with each item's status and photos, the daily reports and photos that show the condition of the work on the date, and the signed certificate stored in the project's files. See punch list and Gantt chart schedule.
Related terms
The punch list is written at substantial completion. Closeout follows it. Retainage is often reduced or released at this point, and the warranty walk is scheduled from this date.
Frequently asked questions
Who decides when substantial completion is reached?
It follows the contract. Commonly the architect inspects and certifies the date, with the owner and contractor signing.
Is substantial completion the same as final completion?
No. Final completion comes after the punch list is finished and all closeout documents are delivered.
Does the warranty start at substantial completion?
In many contracts it does, but not all. Check the warranty section of your contract.
This page is general information, not legal advice. Your contract decides what these terms mean on your job.
Related
- Punch list: A punch list is the list of small items that must be fixed or finished before a job is accepted as complete. Example, mistakes and related terms.
- Closeout: Closeout is the last phase of a construction project: finishing the punch list, handing over documents and getting final payment. Example and mistakes.
- Retainage: Retainage is a share of each progress payment held back until the work is finished. See an example, common mistakes and how retainage is tracked.
- Punch list: Track punch items by phase with photos, a pin on the drawing, an assignee and a due date. Items move from Open to Verified, with alerts at each step.
- Gantt chart schedule: Build the project schedule as a Gantt chart: drag bars, link tasks with lag days, set milestones, save a baseline and export a PDF for the meeting.
Start a 30-day free trial · Pricing · Features · Free templates · Guides · By trade · By state