Home › Glossary › JHA (job hazard analysis)

JHA (job hazard analysis)

A JHA, short for job hazard analysis, is a short written plan for doing a task safely. It breaks the task into steps, names what could hurt someone at each step, and says what the crew will do about it. The crew reviews and signs it before the work starts.

Last updated

What a JHA is

You will hear other names for the same idea: JSA (job safety analysis), AHA (activity hazard analysis) and pre-task plan. The layout is usually three columns: the job step, the hazards in that step, and the controls. It also lists the PPE, permits and training the task needs, and who is in charge.

The point is not the paper. The point is five minutes of the crew thinking through the job together before anyone picks up a tool. A JHA is written for the task and the place, by the people doing the work. Many general contractors require one from every crew every day, or whenever the task changes.

A JHA on a real job

A crew is setting roof trusses with a crane. The foreman's JHA lists the steps: unload and stage the trusses, rig and lift, set and brace, release the rigging. Under lift, the hazards are a dropped load and workers under it. The controls are a clear lift zone, a tag line and one signal person. Under set and brace, the hazard is a fall from the top plate, and the control is fall protection tied off to an approved anchor. Six people sign it at seven in the morning.

Common mistakes with JHAs

JHAs in Trakend

In Trakend a foreman builds the JHA on a phone: pick lists for hazards, permits, training and PPE, a job steps table, and a crew sign-in sheet with finger signatures and times. Yesterday's JHA can be duplicated to today without the old signatures, Maya can draft one for each crew, and subcontractors on your job can fill out their own. See the JHA builder or print a free JHA template.

Related terms

The morning safety meeting is a toolbox talk, which is separate from the JHA. Some tasks need a competent person named on site, and some need a permit such as lockout/tagout.

Frequently asked questions

What is the difference between a JHA and a JSA?

In practice, nothing. They are two names for the same kind of document. Use the name your customer or your company uses.

Who writes the JHA?

The foreman or lead for the task, together with the crew who will do the work.

How often is a JHA needed?

That depends on your company and your contract. Many jobs require one per crew per day, and a new one when the task, location or conditions change.

This page is general information, not safety or legal advice. The employer is responsible for site-specific hazards, training and compliance with OSHA and state rules.

Related

Start a 30-day free trial · Pricing · Features · Free templates · Guides · By trade · By state