Home › Free templates › JHA templates

Free construction JHA templates

Job hazard analysis templates for common construction activities. Each one breaks the work into steps and lists the hazards, the controls, the PPE, and the permits and training to check. Print it, change it to fit your site, and have the crew sign.

JHA templates by activity

Site and civil

Concrete and structure

Working at height

Building trades

Mechanical, electrical and plumbing

Special hazards

General

What is a JHA?

A job hazard analysis (JHA) is a short written plan for doing a task safely. You may also hear it called a JSA, an AHA or a pre-task plan. It lists the steps of the job, what could hurt someone at each step, and what the crew will do about it.

The crew that does the work should help write it and should sign it before work starts. If the job changes during the day, for example new equipment shows up or the weather turns, stop and update the JHA.

How to use a template

  1. Pick the activity closest to your task.
  2. Walk the work area and compare it to the template.
  3. Add hazards the template does not list, and remove steps that do not apply.
  4. Review it with the crew, answer questions, and have everyone sign.
  5. Keep it at the work area and update it when conditions change.

Fill out JHAs on a phone

In Trakend the JHA form has pick lists for hazards, permits, training, PPE and controls, a job steps table, and a crew sign-in with signatures and times. You can copy yesterday's JHA to today without copying the old signatures. See Trakend safety features or the guide on how to write a JHA.

Frequently asked questions

Is a JHA the same as a JSA?

In practice, yes. JHA (job hazard analysis), JSA (job safety analysis), AHA (activity hazard analysis) and pre-task plan are names for the same idea: steps, hazards and controls written down before the work starts.

Who should fill out the JHA?

The foreman or lead for the task, together with the crew doing the work. The people closest to the work know the real hazards.

How often do we need a new JHA?

Many contractors write or review one for each task each day, and again when the work, the crew or the conditions change. Your contract or your general contractor may set the rule.

Related

Start a 30-day free trial · Pricing · Features · Free templates · Guides · By trade · By state