Closeout
Closeout is the last phase of a construction project. The building work is essentially done, and what remains is finishing the punch list, handing the owner the documents the contract requires, and settling the final money.
Last updated
What closeout is
The specifications normally list what has to be delivered. The usual items are below. Final payment and the release of retainage typically wait until all of it is turned in.
- A completed and verified punch list.
- As-built drawings showing how the work was really installed.
- Operation and maintenance manuals for the equipment.
- Warranties from the contractor, the subcontractors and the manufacturers.
- Spare parts, attic stock and keys.
- Training for the owner's staff on the building systems.
- Final lien waivers and the final pay application.
Closeout on a real job
A general contractor finishes a small school gym in August. The building is in use, but the final payment and retainage are still outstanding. The project engineer has kept a closeout checklist since the spring. By the time the punch list is cleared, the mechanical manuals, the roofing warranty and the as-builts are already in hand. The package goes to the architect two weeks after substantial completion, and the final payment follows the month after.
Common mistakes with closeout
- Starting to collect closeout documents after the subcontractors have left the job.
- Paying subcontractors in full before they turn in their manuals, warranties and as-builts.
- Not listing closeout items on the submittal log from day one.
- Handing over a box of loose papers instead of an organized package.
- Forgetting the owner training the specifications call for.
Closeout in Trakend
Trakend has no single closeout button. The pieces are in the tools you already used on the job. Closeout submittals such as warranties and manuals can be tracked in the submittal register. The punch list shows what is verified. Final pay applications, retainage and lien waivers are in billing. And an admin can export one project as a zip with its records, photos, drawings and PDFs to hand over or archive. See company data export and file management.
Related terms
Closeout follows substantial completion and includes clearing the punch list, delivering as-built drawings and O&M manuals, and releasing retainage.
Frequently asked questions
How long does closeout take?
It varies a great deal. Jobs that collect documents as they go can close in weeks. Jobs that start at the end often take months.
What is a closeout package?
The organized set of documents handed to the owner: as-builts, manuals, warranties, test reports, permits and inspection sign-offs, and contact lists.
When should closeout start?
At the beginning of the job. List the closeout items early and collect each one when the related work is finished.
Related
- Punch list: A punch list is the list of small items that must be fixed or finished before a job is accepted as complete. Example, mistakes and related terms.
- As-built drawings: As-built drawings are the plans marked up to show how the work was really installed. See an example, common mistakes and related closeout terms.
- O&M manual: An O&M (operation and maintenance) manual gives the owner the instructions, schedules and warranties for the building’s equipment. Example and mistakes.
- Company data export: An admin can download the whole company or one project as a single zip: every record as CSV and JSON, plus photos, drawings and PDFs. No fee.
- Submittal tracking: Run the submittal register in one place: bulk setup from spec sections, review status, revisions, order-by dates from lead times and PDF packages.
Start a 30-day free trial · Pricing · Features · Free templates · Guides · By trade · By state