Closeout

Closeout is the last phase of a construction project. The building work is essentially done, and what remains is finishing the punch list, handing the owner the documents the contract requires, and settling the final money.

Last updated

What closeout is

The specifications normally list what has to be delivered. The usual items are below. Final payment and the release of retainage typically wait until all of it is turned in.

Closeout on a real job

A general contractor finishes a small school gym in August. The building is in use, but the final payment and retainage are still outstanding. The project engineer has kept a closeout checklist since the spring. By the time the punch list is cleared, the mechanical manuals, the roofing warranty and the as-builts are already in hand. The package goes to the architect two weeks after substantial completion, and the final payment follows the month after.

Common mistakes with closeout

Closeout in Trakend

Trakend has no single closeout button. The pieces are in the tools you already used on the job. Closeout submittals such as warranties and manuals can be tracked in the submittal register. The punch list shows what is verified. Final pay applications, retainage and lien waivers are in billing. And an admin can export one project as a zip with its records, photos, drawings and PDFs to hand over or archive. See company data export and file management.

Related terms

Closeout follows substantial completion and includes clearing the punch list, delivering as-built drawings and O&M manuals, and releasing retainage.

Frequently asked questions

How long does closeout take?

It varies a great deal. Jobs that collect documents as they go can close in weeks. Jobs that start at the end often take months.

What is a closeout package?

The organized set of documents handed to the owner: as-builts, manuals, warranties, test reports, permits and inspection sign-offs, and contact lists.

When should closeout start?

At the beginning of the job. List the closeout items early and collect each one when the related work is finished.