Home › Glossary › Lump sum contract
Lump sum contract (stipulated sum)
A lump sum contract, also called a stipulated sum or fixed price contract, sets one total price for a defined scope of work. The contractor is paid that amount no matter what the work ends up costing, unless the scope changes.
Last updated
What a lump sum contract is
It is the most common arrangement on commercial building work. The owner gets a known price. The contractor takes the risk of building the scope for that price and keeps the savings if the work goes well.
Because the price is fixed, the scope has to be clear. The drawings, the specifications and the list of what is excluded define what the price covers. Anything outside that is a change, and changes are how a fixed price moves. That is why change orders matter so much on lump sum jobs.
A lump sum contract on a real job
A masonry subcontractor signs a lump sum subcontract of three hundred thousand dollars for all block and brick shown on the drawings. Block prices rise during the job. That is the subcontractor's risk, and the price stays the same. Then the owner adds a block screen wall around the dumpster. That wall is outside the original scope, so it is priced and approved as a change order, and the contract becomes three hundred and twelve thousand.
Common mistakes with lump sum work
- Signing with a vague scope, so every gray area becomes an argument.
- Not listing exclusions in the proposal and making sure they reach the contract.
- Doing extra work without a signed change order because the job is fixed price anyway.
- Not tracking actual cost against the estimate, and finding the loss only at the end.
- Building a schedule of values that does not add up to the lump sum.
Lump sum work in Trakend
Lump sum work is what Trakend's billing tools are laid out for. The contract amount is broken into a schedule of values, billed monthly by percent complete on a G702/G703-style pay application, and adjusted by approved change orders. On the cost side, the budget by cost code shows committed, spent and projected cost, so you can see whether the fixed price is holding. See pay applications and job costing.
Related terms
The price is broken down in a schedule of values and changed only by change order. Undefined items are carried as an allowance. The other common arrangement is a unit price contract.
Frequently asked questions
Who carries the risk in a lump sum contract?
Mostly the contractor. If the defined work costs more than the price, the contractor absorbs it. The owner carries the risk of changes to the scope.
Can a lump sum contract price change?
Yes, through signed change orders for changes in scope, or under specific contract clauses such as hidden conditions.
Is lump sum the same as fixed price?
In everyday use, yes. Stipulated sum is another name for it.
Related
- Schedule of values: A schedule of values breaks the contract price into line items that add up to the total and is used to bill each month. Example and common mistakes.
- Change order: A change order is a signed agreement that changes the contract scope, price or time. See an example, common mistakes and how change orders are tracked.
- Unit price contract: In a unit price contract the contractor is paid a set price per unit of work, multiplied by the measured quantity. Example and common mistakes.
- Pay applications: Build monthly pay applications from your schedule of values: bill by percent or dollars, carry prior billing forward, hold retainage and print a clean PDF.
- Job costing: See budget, committed, spent, projected and remaining cost for every cost code on a job. Actual cost comes from approved invoices, expenses and rentals.