Home › Free templates › JHA templates › Plumbing
Plumbing JHA template
A job hazard analysis for plumbing crews. It covers isolating systems, cutting and joining pipe, overhead and in-wall work, crawl spaces and sewage, and pressure testing.
Last updated
When to use this JHA
Use this JHA for underground, rough-in, top-out and service work on water, waste, vent and gas piping. Plumbers work in every part of a building, from trenches to ceilings, so add the trenching or ladder JHA when that is where the day will be spent.
Job steps, hazards and controls
| Job step | Hazards | Controls |
|---|---|---|
| Isolate water / gas systems | Stored pressure; gas leaks; scalding water | Shut off and drain; LOTO water heaters and pumps; verify zero pressure |
| Cut, solder, glue or press pipe | Burns and fire (soldering); solvent cement vapors; cuts | Hot work permit + fire watch for torch work; fire extinguisher within reach; ventilate for PVC cement; SDS reviewed |
| Overhead and in-wall work | Ladder falls; eye injury; dust when coring | Inspect ladder before use; safety glasses; wet coring |
| Work in crawl spaces or with sewage | Confined spaces; biological hazards | Evaluate the space before entry; gloves and hand washing; vaccines per company policy |
| Pressure test | Line or fitting blow-off | Test at rated pressure only; keep clear of caps and fittings during the test |
Hazards to list for plumbing work
- Hot work/welding/burning
- Chemical exposure
- Pressurized systems
- Biological hazards
- Falls from height
- Confined spaces
- Manual handling/ergonomic
- Slips/trips
- Struck-by hazards
Controls to put in place
- Hot work permit + fire watch
- Fire extinguisher within reach
- SDS reviewed for chemicals used
- Inspect ladder before use
- Isolate and depressurize lines before work
- Pre-task briefing with crew
- Keep walkways clear (housekeeping)
PPE, permits and training
- Standard site PPE: Hard hat, Safety glasses (ANSI Z87.1), Steel-toed boots, High-visibility vest, Safety gloves.
- Added for plumbing work: Chemical-resistant gloves, Safety goggles, Fire extinguisher, Lockout/tagout devices.
- Permits and plans: Hot Work (Welding/Burning) Permit, Line Break Permit, Lockout/Tagout
- Training to verify: Hazard Communication, Lockout/Tagout.
What crews most often miss
Torch work inside finished or wood-framed walls starts fires that show up later. Use a heat shield, keep an extinguisher within reach, and follow the hot work permit and fire watch rules for the site. During air or water tests, treat every cap and plug as something that can blow off, and keep faces and bodies out of line with them.
How to use this template
- Before the crew starts, look at the actual work area and check it against the steps listed for plumbing work.
- Add any hazard you find that is not listed, and cross out steps that do not apply today.
- Review it out loud with the crew. Ask what they would add.
- Have everyone sign in below, and update the JHA if the work or the conditions change.
Fill out this JHA in Trakend
In Trakend, a plumbing work JHA starts with these steps, hazards and controls already filled in. The foreman adjusts it on a phone, the crew signs on the screen with time in and time out, and the signed JHA is saved to the project and added to the day's PDF. See safety features or start a 30-day free trial.
Crew sign-in
Print name · Signature · Time in · Time out
Frequently asked questions
Do plumbers need a hot work permit to solder?
On many commercial sites, yes. Any open-flame work usually falls under the site hot work permit and fire watch rules. Check with the general contractor before lighting a torch.
What are the hazards of working around sewage?
Exposure to bacteria and other biological hazards, and bad air in pits, manholes and crawl spaces. Wear gloves, wash hands before eating or drinking, and evaluate the space before entering.
This template is general safety information, not legal advice and not a complete safety program. The employer is responsible for finding the hazards on each site, training workers and meeting OSHA and state requirements. Change it to fit your job before the crew signs.
Related
- Plumbing contractors: Software for plumbing contractors: JHAs for hot work and trenches, daily reports, inspections and tests, submittals, T&M tickets and pay apps.
- Welding and hot work: Free welding and hot work JHA: hot work permit, clearing combustibles 35 feet, gas cylinder checks, fumes and arc flash, and the fire watch.
- Trenching and excavation: Free trenching and excavation JHA: 811 locates, competent person inspections, protective systems at 5 ft, spoil setback, ladders and atmosphere checks.
- Fire prevention and extinguisher use: Free 5-minute toolbox talk on jobsite fire prevention and the PASS method for extinguishers: hot work, fuel storage, exits and when to get out.
- Safety, JHAs & toolbox talks: Digital JHAs with crew sign-in signatures, 89 toolbox talks in English and Spanish, incident reports with OSHA recordable flags, and checklists.
Start a 30-day free trial · Pricing · Features · Free templates · Guides · By trade · By state
