Concrete pour and finishing JHA template
A job hazard analysis for placing and finishing concrete. It covers the checks before the pour, trucks and the pump, placing, screeding, finishing, and washout.
Last updated
When to use this JHA
Use this JHA for slabs, footings, walls, curbs and flatwork placed by chute, pump or buggy. Fill it in before the first truck arrives. A pour moves fast once it starts, and nobody stops to talk about hazards with concrete going off.
Job steps, hazards and controls
| Job step | Hazards | Controls |
|---|---|---|
| Check forms, rebar and pour access before the pour | Impalement on rebar; form failure; slips/trips | Rebar caps on exposed vertical bar; competent person checks forms and shoring; clear walkways |
| Position ready-mix trucks and the pump / boom | Struck-by backing trucks; boom contact with power lines; outrigger failure | Spotter for backing equipment; outriggers on firm cribbing; keep 10 ft+ from overhead lines; stay out from under the boom |
| Place concrete (chute, pump hose, buggy) | Hose whip; struck-by; caught-between; manual handling | Never stand in front of the hose end when starting or clearing; hose man and operator in radio/visual contact; team lift |
| Screed, vibrate and float | Wet concrete skin burns (alkaline, pH 12–13); electrical (vibrator cords); ergonomic strain | Waterproof gloves and boots, cuffs over boots; rinse skin right away; GFCI on all cords; rotate tasks |
| Finish with hand tools / power trowel | Rotating blades; noise; CO from gas trowels indoors | Trowel dead-man switch works; guards in place; ventilation when using gas equipment inside; hearing protection |
| Wash out and cure | Chemical exposure (curing compounds); eye splash | Designated washout area; review SDS; safety glasses or goggles |
Hazards to list for concrete pours and finishing
- Chemical exposure
- Concrete dust
- Vehicle/equipment movement
- Struck-by hazards
- Caught-in/between
- Electrical hazards
- Manual handling/ergonomic
- Noise exposure
- Wet concrete burns (alkaline)
- Rebar impalement
- Pump hose whip
- Slips/trips
Controls to put in place
- Spotter for backing equipment
- GFCI on all cords
- Team lift / use dolly over 50 lbs
- SDS reviewed for chemicals used
- Cap exposed rebar
- Keep clear of pump hose end
- Outriggers on firm cribbing
- Hearing protection in high-noise areas
- Pre-task briefing with crew
- Keep walkways clear (housekeeping)
PPE, permits and training
- Standard site PPE: Hard hat, Safety glasses (ANSI Z87.1), Steel-toed boots, High-visibility vest, Safety gloves.
- Added for concrete pours and finishing: Chemical-resistant gloves, Safety goggles, Hearing protection (plugs/muffs), Safety shower/eye wash, Safety data sheets (SDS) on site, Waterproof boots.
- Permits and plans: None listed for this activity. Check what your site and your general contractor require.
- Training to verify: Hazard Communication, Equipment Operation.
What crews most often miss
Wet concrete burns are easy to ignore because they do not hurt right away. Concrete trapped inside a boot or under a glove cuff keeps burning skin for hours. Make sure rinse water is at the pour, and that the hose crew knows nobody stands in front of the hose end when the pump starts or when a plug is cleared.
How to use this template
- Before the crew starts, look at the actual work area and check it against the steps listed for concrete pours and finishing.
- Add any hazard you find that is not listed, and cross out steps that do not apply today.
- Review it out loud with the crew. Ask what they would add.
- Have everyone sign in below, and update the JHA if the work or the conditions change.
Fill out this JHA in Trakend
In Trakend, a concrete pours and finishing JHA starts with these steps, hazards and controls already filled in. The foreman adjusts it on a phone, the crew signs on the screen with time in and time out, and the signed JHA is saved to the project and added to the day's PDF. See safety features or start a 30-day free trial.
Crew sign-in
Print name · Signature · Time in · Time out
Frequently asked questions
Why does wet concrete burn skin?
Wet concrete is strongly alkaline. It can cause chemical burns when it stays on skin, especially inside boots, gloves and wet clothing. Waterproof gloves and boots and rinsing right away are the main controls.
What is hose whip?
When air is trapped in a concrete pump line, the end hose can swing violently as it clears. Keep everyone except the hose operator away from the hose end at startup and when clearing a blockage.
This template is general safety information, not legal advice and not a complete safety program. The employer is responsible for finding the hazards on each site, training workers and meeting OSHA and state requirements. Change it to fit your job before the crew signs.
Related
- Concrete contractors: Software for concrete contractors: pour-day JHAs, daily reports with crews and weather, crew time clock, T&M tickets, change orders and pay apps.
- Concrete saw cutting and coring: Free concrete saw cutting and coring JHA: scanning for embeds, silica dust controls under Table 1, kickback, slurry, and safe removal of cut sections.
- Silica dust exposure: Free 5-minute silica dust toolbox talk: where silica comes from, wet cutting, vacuums, Table 1, respirators, and why you never dry sweep.
- Back injury prevention and lifting: Free 5-minute safe lifting toolbox talk: planning the lift, keeping the load close, team lifts, carts and hoists, and avoiding the twist.
- Safety, JHAs & toolbox talks: Digital JHAs with crew sign-in signatures, 89 toolbox talks in English and Spanish, incident reports with OSHA recordable flags, and checklists.
Start a 30-day free trial · Pricing · Features · Free templates · Guides · By trade · By state