Home › Free templates › JHA templates › Concrete pour and finishing

Concrete pour and finishing JHA template

A job hazard analysis for placing and finishing concrete. It covers the checks before the pour, trucks and the pump, placing, screeding, finishing, and washout.

Last updated

When to use this JHA

Use this JHA for slabs, footings, walls, curbs and flatwork placed by chute, pump or buggy. Fill it in before the first truck arrives. A pour moves fast once it starts, and nobody stops to talk about hazards with concrete going off.

Job steps, hazards and controls

Job stepHazardsControls
Check forms, rebar and pour access before the pourImpalement on rebar; form failure; slips/tripsRebar caps on exposed vertical bar; competent person checks forms and shoring; clear walkways
Position ready-mix trucks and the pump / boomStruck-by backing trucks; boom contact with power lines; outrigger failureSpotter for backing equipment; outriggers on firm cribbing; keep 10 ft+ from overhead lines; stay out from under the boom
Place concrete (chute, pump hose, buggy)Hose whip; struck-by; caught-between; manual handlingNever stand in front of the hose end when starting or clearing; hose man and operator in radio/visual contact; team lift
Screed, vibrate and floatWet concrete skin burns (alkaline, pH 12–13); electrical (vibrator cords); ergonomic strainWaterproof gloves and boots, cuffs over boots; rinse skin right away; GFCI on all cords; rotate tasks
Finish with hand tools / power trowelRotating blades; noise; CO from gas trowels indoorsTrowel dead-man switch works; guards in place; ventilation when using gas equipment inside; hearing protection
Wash out and cureChemical exposure (curing compounds); eye splashDesignated washout area; review SDS; safety glasses or goggles

Hazards to list for concrete pours and finishing

Controls to put in place

PPE, permits and training

What crews most often miss

Wet concrete burns are easy to ignore because they do not hurt right away. Concrete trapped inside a boot or under a glove cuff keeps burning skin for hours. Make sure rinse water is at the pour, and that the hose crew knows nobody stands in front of the hose end when the pump starts or when a plug is cleared.

How to use this template

  1. Before the crew starts, look at the actual work area and check it against the steps listed for concrete pours and finishing.
  2. Add any hazard you find that is not listed, and cross out steps that do not apply today.
  3. Review it out loud with the crew. Ask what they would add.
  4. Have everyone sign in below, and update the JHA if the work or the conditions change.

Fill out this JHA in Trakend

In Trakend, a concrete pours and finishing JHA starts with these steps, hazards and controls already filled in. The foreman adjusts it on a phone, the crew signs on the screen with time in and time out, and the signed JHA is saved to the project and added to the day's PDF. See safety features or start a 30-day free trial.

Crew sign-in

Print name · Signature · Time in · Time out

Frequently asked questions

Why does wet concrete burn skin?

Wet concrete is strongly alkaline. It can cause chemical burns when it stays on skin, especially inside boots, gloves and wet clothing. Waterproof gloves and boots and rinsing right away are the main controls.

What is hose whip?

When air is trapped in a concrete pump line, the end hose can swing violently as it clears. Keep everyone except the hose operator away from the hose end at startup and when clearing a blockage.

This template is general safety information, not legal advice and not a complete safety program. The employer is responsible for finding the hazards on each site, training workers and meeting OSHA and state requirements. Change it to fit your job before the crew signs.

Related

Start a 30-day free trial · Pricing · Features · Free templates · Guides · By trade · By state