HVAC and mechanical JHA template

A job hazard analysis for HVAC and mechanical crews. It covers lockout, hanging duct and equipment overhead, setting rooftop units, brazing and refrigerant handling, and cutting sheet metal.

Last updated

When to use this JHA

Use this JHA for ductwork, piping, equipment setting and startup. Mechanical crews move between ladders, lifts and roofs in the same day, and a single task can include electrical, hot work and lifting hazards. Walk the whole path of the work before filling this in.

Job steps, hazards and controls

Job stepHazardsControls
Lockout the equipmentShock; moving fans and belts; stored energyLockout/tagout before work; test for absence of voltage; wait for fans to stop
Hang duct and equipment overheadFalls from ladders or lifts; dropped loadsInspect ladder before use; aerial lift harness tied off; stay clear of suspended loads
Set rooftop unitsFalls at roof edges; crane lift hazardsGuardrails or tie-off within 6 ft of edges; lift plan and qualified rigger; stay clear of suspended loads
Braze, solder and handle refrigerantBurns; fire; refrigerant frostbite and displacement of oxygenHot work permit + fire watch; EPA 608 certified handling; ventilate; gloves and goggles
Cut sheet metalLacerationsCut-resistant gloves; deburr edges

Hazards to list for HVAC and mechanical work

Controls to put in place

PPE, permits and training

What crews most often miss

The roof is the part of the job that gets treated casually. Setting a rooftop unit means a crane lift and people near an unprotected edge at the same moment, so settle the fall protection and the lift plan before pick day. On startup and service, lock out the unit and wait for fans to stop fully before reaching in.

How to use this template

  1. Take this HVAC and mechanical work template to the work area and check each step against real conditions.
  2. Add any hazard you find that is not listed, and cross out steps that do not apply today.
  3. Review it out loud with the crew. Ask what they would add.
  4. Have everyone sign in below, and update the JHA if the work or the conditions change.

Fill out this JHA in Trakend

In Trakend, a HVAC and mechanical work JHA starts with these steps, hazards and controls already filled in. The foreman adjusts it on a phone, the crew signs on the screen with time in and time out, and the signed JHA is saved to the project and added to the day's PDF. See safety features or start a 30-day free trial.

Crew sign-in

Print name · Signature · Time in · Time out

Frequently asked questions

Who can handle refrigerant?

Technicians who maintain, service, repair or dispose of equipment containing regulated refrigerants need EPA Section 608 certification.

When is fall protection needed on a roof for HVAC work?

When working 6 feet or more above a lower level near an unprotected edge or opening. Guardrails, a personal fall arrest system or another compliant method must be in place.

This template is general safety information, not legal advice and not a complete safety program. The employer is responsible for finding the hazards on each site, training workers and meeting OSHA and state requirements. Change it to fit your job before the crew signs.