Underground utilities JHA template
A job hazard analysis for installing water, sewer, storm, gas and conduit underground. It covers locating existing lines, the trench, setting pipe and structures, tie-ins, and testing and backfill.
Last updated
When to use this JHA
Use this JHA for pipe crews and duct bank crews. Utility work stacks several serious hazards in one place: a trench that can cave in, loads swinging over the trench, live lines nearby, and manholes or vaults that can hold bad air. Go through each one before the day starts.
Job steps, hazards and controls
| Job step | Hazards | Controls |
|---|---|---|
| Verify 811 locates and pothole existing lines | Strike of live gas, electric or fiber | Valid 811 ticket; hand-dig/vacuum excavate within the tolerance zone; owner standby for critical lines |
| Excavate and protect the trench | Cave-in; struck-by equipment | Protective system at 5 ft or deeper; competent person inspection; ladder within 25 ft |
| Lower and set pipe or structures | Struck by swinging or dropped loads; caught-between pipe and trench wall | Rated rigging inspected; tag lines; stay clear of suspended loads; workers out of the trench while the load is lowered into position |
| Connect to existing systems / tie-ins | Hazardous atmosphere in manholes; stored pressure; sewage (biological) | Gas monitor before entry; confined space permit where required; isolate and depressurize lines; hand washing and gloves |
| Test, backfill and restore | Pressure-test failure; caught-between compaction equipment | Exclusion zone during pressure tests; remove workers before backfill |
Hazards to list for underground utility work
- Excavation/trenching
- Structural collapse
- Confined spaces
- Pressurized systems
- Biological hazards
- Struck-by hazards
- Caught-in/between
- Electrical hazards
- Fire/explosion
- Buried utilities
- Slips/trips
Controls to put in place
- Shoring / sloping per competent person
- Ladder within 25 ft in trench
- Daily trench inspection
- Gas monitor before entry
- Stay clear of suspended loads
- 811 locate verified before digging
- Isolate and depressurize lines before tie-in
- Pre-task briefing with crew
- Keep walkways clear (housekeeping)
PPE, permits and training
- Standard site PPE: Hard hat, Safety glasses (ANSI Z87.1), Steel-toed boots, High-visibility vest, Safety gloves.
- Added for underground utility work: Air monitor, Chemical-resistant gloves, Barricades/safety cones.
- Permits and plans: Excavation Permit, Line Break Permit
- Training to verify: Trenching & Shoring, Confined Space Entry, Equipment Operation.
What crews most often miss
The tie-in is where routine days go wrong. Before anyone connects to an existing system, confirm the line is isolated and has no pressure, and test the air before entering a manhole or vault. During pressure tests, clear people away from caps, plugs and fittings. And keep workers out of the trench while pipe or structures are lowered in.
How to use this template
- Before the crew starts, look at the actual work area and check it against the steps listed for underground utility work.
- Add any hazard you find that is not listed, and cross out steps that do not apply today.
- Review it out loud with the crew. Ask what they would add.
- Have everyone sign in below, and update the JHA if the work or the conditions change.
Fill out this JHA in Trakend
In Trakend, a underground utility work JHA starts with these steps, hazards and controls already filled in. The foreman adjusts it on a phone, the crew signs on the screen with time in and time out, and the signed JHA is saved to the project and added to the day's PDF. See safety features or start a 30-day free trial.
Crew sign-in
Print name · Signature · Time in · Time out
Frequently asked questions
What is potholing?
Carefully digging by hand or with vacuum excavation to expose an existing buried line so you can see exactly where it is and how deep it is before digging near it with a machine.
When is a manhole a confined space?
Manholes, vaults and similar structures have limited ways in and out and are not designed for people to stay in. If they have or could have a hazard such as bad air, they must be treated as permit-required confined spaces under OSHA 29 CFR 1926 Subpart AA.
This template is general safety information, not legal advice and not a complete safety program. The employer is responsible for finding the hazards on each site, training workers and meeting OSHA and state requirements. Change it to fit your job before the crew signs.
Related
- Underground utility contractors: Software for underground utility contractors: trench and confined space JHAs, daily footage reports, as-built photos, T&M tickets and pay apps.
- Trenching and excavation: Free trenching and excavation JHA: 811 locates, competent person inspections, protective systems at 5 ft, spoil setback, ladders and atmosphere checks.
- Confined space entry: Free confined space JHA: evaluating the space, the entry permit, isolation, air testing and ventilation, the attendant, and rescue readiness.
- Working near utilities: Free 5-minute toolbox talk on underground and overhead utilities: 811 locates, hand digging near marks, power line clearance and what to do after a strike.
- Safety, JHAs & toolbox talks: Digital JHAs with crew sign-in signatures, 89 toolbox talks in English and Spanish, incident reports with OSHA recordable flags, and checklists.
Start a 30-day free trial · Pricing · Features · Free templates · Guides · By trade · By state