Home › Free templates › JHA templates › Welding and hot work
Welding and hot work JHA template
A job hazard analysis for welding, torch cutting, brazing and grinding that throws sparks. It covers the permit and area check, equipment and cylinders, the work itself, and the fire watch.
Last updated
When to use this JHA
Use this JHA for any hot work outside a dedicated welding shop. Attach the hot work permit if your site requires one. Welding and cutting rules for construction are in OSHA 29 CFR 1926 Subpart J. The key question before striking an arc is simple: what can burn within 35 feet, including behind the wall and below the floor?
Job steps, hazards and controls
| Job step | Hazards | Controls |
|---|---|---|
| Get the hot work permit and inspect the area | Fire from sparks and slag; flammables nearby | Hot work permit + fire watch; move combustibles 35 ft away or cover with fire blankets; check walls, floors and openings for hidden combustibles |
| Inspect equipment and cylinders | Gas leaks; cylinder rupture | Cylinders upright, chained, caps on when not in use; oxygen and fuel stored 20 ft apart or behind a 5 ft barrier; flashback arrestors; leads and hoses inspected |
| Weld / cut | Burns; UV arc flash to eyes; fumes (hex chrome on stainless) | Welding hood with the right shade; screens for others nearby; ventilation or fume extraction; respirator as needed |
| Fire watch | Smoldering fires after work stops | Fire extinguisher within reach; fire watch during and at least 30–60 minutes after hot work |
Hazards to list for welding, cutting and other hot work
- Hot work/welding/burning
- Fire/explosion
- Chemical exposure
- Radiation
- Electrical hazards
- Pressurized systems
- Welding fumes
- Burns
- Slips/trips
- Struck-by hazards
Controls to put in place
- Hot work permit + fire watch
- Fire extinguisher within reach
- Combustibles cleared 35 ft or covered
- Cylinders upright, secured and capped
- Ventilation / fume extraction
- Welding screens for nearby workers
- Pre-task briefing with crew
- Keep walkways clear (housekeeping)
PPE, permits and training
- Standard site PPE: Hard hat, Safety glasses (ANSI Z87.1), Steel-toed boots, High-visibility vest, Safety gloves.
- Added for welding, cutting and other hot work: Face shield, FR (flame-retardant) clothing, Fire extinguisher, Welding hood (proper shade), Welding gloves, Respirator.
- Permits and plans: Hot Work (Welding/Burning) Permit
- Training to verify: Hexavalent Chromium, Respiratory Protection, Hazard Communication.
What crews most often miss
Sparks travel through gaps, pipe sleeves and floor openings to places the welder cannot see. Check the other side of walls and the level below. Keep the fire watch in place after the work stops, because fires from hot work often start as a slow smolder. Stainless steel and coated metals also need a fume plan before work begins.
How to use this template
- Walk the work area first and compare what you see with the welding, cutting and other hot work steps above.
- Add any hazard you find that is not listed, and cross out steps that do not apply today.
- Review it out loud with the crew. Ask what they would add.
- Have everyone sign in below, and update the JHA if the work or the conditions change.
Fill out this JHA in Trakend
In Trakend, a welding, cutting and other hot work JHA starts with these steps, hazards and controls already filled in. The foreman adjusts it on a phone, the crew signs on the screen with time in and time out, and the signed JHA is saved to the project and added to the day's PDF. See safety features or start a 30-day free trial.
Crew sign-in
Print name · Signature · Time in · Time out
Frequently asked questions
How long should a fire watch last after hot work?
This template uses at least 30 to 60 minutes after hot work ends. Follow your site permit if it requires longer.
How far should combustibles be from hot work?
Move them at least 35 feet away. If they cannot be moved, cover them with fire-resistant blankets or shields and post a fire watch.
This template is general safety information, not legal advice and not a complete safety program. The employer is responsible for finding the hazards on each site, training workers and meeting OSHA and state requirements. Change it to fit your job before the crew signs.
Related
- Fire prevention and extinguisher use: Free 5-minute toolbox talk on jobsite fire prevention and the PASS method for extinguishers: hot work, fuel storage, exits and when to get out.
- Steel erectors: Software for steel erectors: erection JHAs, crane-day paperwork, daily reports by sequence, RFIs for fit-up problems, T&M tickets and pay apps.
- Steel erection: Free steel erection JHA: site readiness and anchor bolts, hoisting, connecting and bolting, decking, field welding, and fall protection for ironworkers.
- Personal protective equipment (PPE): Free 5-minute PPE toolbox talk: hard hats, eye and hearing protection, gloves, boots, high-visibility vests and respirators, with questions and sign-in.
- Safety, JHAs & toolbox talks: Digital JHAs with crew sign-in signatures, 89 toolbox talks in English and Spanish, incident reports with OSHA recordable flags, and checklists.
Start a 30-day free trial · Pricing · Features · Free templates · Guides · By trade · By state
