Home › Free templates › JHA templates › Paving and asphalt
Paving and asphalt JHA template
A job hazard analysis for asphalt paving crews. It follows the work from setting up traffic control to rolling and tack coat, with the hazards and controls for each step.
Last updated
When to use this JHA
Use this JHA for hot mix paving, overlays, patching and sealcoating on roads and parking lots. Paving puts people on foot next to dump trucks, a paver and rollers, often with live traffic a few feet away, so most of this JHA is about keeping people out of the path of moving equipment.
Job steps, hazards and controls
| Job step | Hazards | Controls |
|---|---|---|
| Set up work zone and traffic control | Struck by passing traffic and site vehicles | Cones/barricades and signs per the traffic control plan (MUTCD); flaggers trained; high-visibility vests |
| Haul trucks back up and dump into the paver | Struck-by / caught-between trucks and paver; backing vehicles | Spotter for backing equipment; stay out of blind spots; eye contact with operator before approaching; working back-up alarms |
| Place hot mix with the paver and screed | Burns from hot asphalt (~300°F); fumes; moving machinery | Long sleeves and gloves; stand upwind of fumes; stay clear of auger and conveyor; guards in place |
| Rake, lute and hand work | Burns; manual handling strains; heat stress | Rotate workers; water, rest and shade breaks; proper lifting |
| Compact with rollers | Roller tip-over at edges; run-over; vibration; noise | Seat belt and ROPS on rollers; keep off unsupported edges; ground workers stay clear of roller path; hearing protection |
| Apply tack coat / sealer | Chemical exposure; slippery surfaces; fire from heated emulsions | Review SDS; chemical-resistant gloves; keep ignition sources away; mark wet areas |
Hazards to list for asphalt paving
- Vehicle/equipment movement
- Moving machinery/equipment
- Caught-in/between
- Temperature extremes
- Chemical exposure
- Noise exposure
- Fire/explosion
- Burns from hot asphalt
- Asphalt fumes
- Work-zone traffic
- Slips/trips
- Struck-by hazards
Controls to put in place
- Spotter for backing equipment
- Hearing protection in high-noise areas
- Water, rest and shade breaks
- SDS reviewed for chemicals used
- Traffic control plan in place (cones, signs, flaggers)
- Stay out of equipment blind spots
- Pre-task briefing with crew
- Keep walkways clear (housekeeping)
PPE, permits and training
- Standard site PPE: Hard hat, Safety glasses (ANSI Z87.1), Steel-toed boots, High-visibility vest, Safety gloves.
- Added for asphalt paving: High-visibility vest, Hearing protection (plugs/muffs), Safety gloves, Barricades/safety cones, Fire extinguisher, Safety data sheets (SDS) on site.
- Permits and plans: None listed for this activity. Check what your site and your general contractor require.
- Training to verify: Equipment Operation, Hazard Communication.
What crews most often miss
The step crews skip most often is the plan for trucks. Decide before the first load where trucks stage, who spots them back to the paver, and where ground workers stand while a truck is backing. Also check the weather: paving days are often the hottest days, and the mat adds heat from below.
How to use this template
- Walk the work area first and compare what you see with the asphalt paving steps above.
- Add any hazard you find that is not listed, and cross out steps that do not apply today.
- Review it out loud with the crew. Ask what they would add.
- Have everyone sign in below, and update the JHA if the work or the conditions change.
Fill out this JHA in Trakend
In Trakend, a asphalt paving JHA starts with these steps, hazards and controls already filled in. The foreman adjusts it on a phone, the crew signs on the screen with time in and time out, and the signed JHA is saved to the project and added to the day's PDF. See safety features or start a 30-day free trial.
Crew sign-in
Print name · Signature · Time in · Time out
Frequently asked questions
What are the main hazards of asphalt paving?
Being struck by traffic or backing trucks, getting caught between a truck and the paver, burns from hot mix, roller tip-overs at edges, fumes, noise and heat stress.
Do paving crews need a traffic control plan?
When the work is in or next to a road that is open to traffic, yes. Set cones, signs and flaggers the way the traffic control plan for the job shows, and brief the crew on it before work starts.
This template is general safety information, not legal advice and not a complete safety program. The employer is responsible for finding the hazards on each site, training workers and meeting OSHA and state requirements. Change it to fit your job before the crew signs.
Related
- Paving and asphalt contractors: Software for paving and asphalt contractors: traffic control JHAs, daily reports with tons and temperatures, GPS time clock, T&M tickets and pay apps.
- Heat illness prevention: Free 5-minute heat illness toolbox talk: water, rest and shade, easing new workers in, and the signs of heat exhaustion and heat stroke.
- Distracted driving and equipment operation: Free 5-minute toolbox talk on distraction behind the wheel and in the cab: phones, spotters, blind spots, seat belts and fatigue.
- Earthwork and grading: Free earthwork and grading JHA for dozers, graders, loaders, scrapers and rollers: blind spots, rollovers, utilities, dust and heat, with controls.
- Safety, JHAs & toolbox talks: Digital JHAs with crew sign-in signatures, 89 toolbox talks in English and Spanish, incident reports with OSHA recordable flags, and checklists.
Start a 30-day free trial · Pricing · Features · Free templates · Guides · By trade · By state
