Home › Free templates › JHA templates › Earthwork and grading

Earthwork and grading JHA template

A job hazard analysis for mass grading, cut and fill, and compaction with heavy equipment. It covers the walk-through, pre-use inspections, moving dirt, stockpiles, compaction, and dust and heat.

Last updated

When to use this JHA

Use this JHA for site grading, pad building, haul roads and any day when dozers, loaders, scrapers, graders and rollers share a site with people on foot. The biggest risks are run-overs and rollovers, so the controls focus on spotters, blind spots, seat belts and staying off soft edges.

Job steps, hazards and controls

Job stepHazardsControls
Verify utility locates and walk the work areaContact with buried or overhead utilities; soft ground; drop-offs811 ticket valid and marks visible; flag drop-offs and soft areas; keep equipment 10 ft+ from overhead lines
Pre-use inspection and mounting equipmentMechanical failure; falls getting on and off; rolloverEquipment pre-use checklist done; seat belt and ROPS; 3-point contact getting on and off
Cut, fill and grade with dozers, graders, loaders and scrapersStruck-by / run-over; backing equipment; rollover on slopes and edgesSpotter for backing equipment; working back-up alarms; stay out of blind spots; eye contact with operators; keep off unstable edges and steep side slopes
Excavate and stockpile materialCollapse of cut faces; material falling from stockpiles; equipment at edgesSlope or bench cut faces per competent person; spoil and stockpiles at least 2 ft back from edges; barricade drop-offs
Compact and proof-rollRoller tip-over at edges; run-over; vibration; noiseGround workers stay clear of the roller path; seat belt; keep off unsupported edges; hearing protection
Dust and heat controlDust (including silica); heat illnessWater truck / wet the haul roads; respirator where dust cannot be controlled; water, rest and shade breaks

Hazards to list for earthwork and grading

Controls to put in place

PPE, permits and training

What crews most often miss

Ground workers and operators need one simple rule they both follow: nobody walks up to a machine until the operator has seen them and stopped. Grade checkers and laborers get hurt when they assume the operator knows where they are. Also re-walk the site after rain. Edges and slopes that held yesterday may not hold today.

How to use this template

  1. Walk the work area first and compare what you see with the earthwork and grading steps above.
  2. Add any hazard you find that is not listed, and cross out steps that do not apply today.
  3. Review it out loud with the crew. Ask what they would add.
  4. Have everyone sign in below, and update the JHA if the work or the conditions change.

Fill out this JHA in Trakend

In Trakend, a earthwork and grading JHA starts with these steps, hazards and controls already filled in. The foreman adjusts it on a phone, the crew signs on the screen with time in and time out, and the signed JHA is saved to the project and added to the day's PDF. See safety features or start a 30-day free trial.

Crew sign-in

Print name · Signature · Time in · Time out

Frequently asked questions

What causes most heavy equipment injuries on grading jobs?

People on foot being struck or run over by moving or backing equipment, and operators being hurt in rollovers on slopes and edges. Spotters, working alarms, seat belts and clear travel paths are the main controls.

Do I need to call 811 for grading work?

Yes, before any digging or cutting. Verify the locate ticket is current and the marks are still visible before equipment starts moving dirt.

This template is general safety information, not legal advice and not a complete safety program. The employer is responsible for finding the hazards on each site, training workers and meeting OSHA and state requirements. Change it to fit your job before the crew signs.

Related

Start a 30-day free trial · Pricing · Features · Free templates · Guides · By trade · By state