Home › Free templates › JHA templates › Landscaping and site work
Landscaping and site work JHA template
A job hazard analysis for landscape installation, maintenance and erosion control crews. It covers the site walk, small equipment, digging and planting, chemical application and erosion control.
Last updated
When to use this JHA
Use this JHA for planting, irrigation, sod, mowing and trimming, and silt fence work. Landscape crews often arrive late in a project when other trades are still moving equipment around, or work along roads and parking lots, so add traffic and equipment hazards for your site.
Job steps, hazards and controls
| Job step | Hazards | Controls |
|---|---|---|
| Walk the area for hazards and utilities | Buried irrigation/electric; uneven ground; stinging insects; snakes | 811 locate before digging or staking; walk the site first; first aid kit with sting kit |
| Operate mowers, trimmers and small equipment | Thrown objects; contact with blades; noise | Guards in place; clear debris first; keep bystanders 50 ft from trimmers; face shield or safety glasses; hearing protection |
| Dig, plant and spread material | Back strain; struck-by skid steer | Team lift / use dolly over 50 lbs; spotter for backing equipment |
| Apply fertilizer, herbicide or pesticide | Chemical exposure; drift | Read the label and SDS; chemical-resistant gloves; apply only when wind is low |
| Install erosion control | Hammer/stake strikes; slips on slopes | Proper footing on slopes; gloves; inspect after rain |
Hazards to list for landscaping and site work
- Moving machinery/equipment
- Struck-by hazards
- Noise exposure
- Chemical exposure
- Temperature extremes
- Manual handling/ergonomic
- Biological hazards
- Slips/trips
Controls to put in place
- Water, rest and shade breaks
- Team lift / use dolly over 50 lbs
- Hearing protection in high-noise areas
- SDS reviewed for chemicals used
- Spotter for backing equipment
- Guards in place on mowers and trimmers
- Pre-task briefing with crew
- Keep walkways clear (housekeeping)
PPE, permits and training
- Standard site PPE: Hard hat, Safety glasses (ANSI Z87.1), Steel-toed boots, High-visibility vest, Safety gloves.
- Added for landscaping and site work: Hearing protection (plugs/muffs), Face shield, Chemical-resistant gloves, Silt fence/erosion control.
- Permits and plans: None listed for this activity. Check what your site and your general contractor require.
- Training to verify: Equipment Operation, Hazard Communication.
What crews most often miss
Shallow lines are the surprise on landscape jobs. Irrigation, lighting wire and communication lines are often only a few inches down. Get a locate before digging or driving stakes, and walk the area first. Also plan for stings and bites: know who on the crew has a severe allergy and where the first aid kit is.
How to use this template
- Take this landscaping and site work template to the work area and check each step against real conditions.
- Add any hazard you find that is not listed, and cross out steps that do not apply today.
- Review it out loud with the crew. Ask what they would add.
- Have everyone sign in below, and update the JHA if the work or the conditions change.
Fill out this JHA in Trakend
In Trakend, a landscaping and site work JHA starts with these steps, hazards and controls already filled in. The foreman adjusts it on a phone, the crew signs on the screen with time in and time out, and the signed JHA is saved to the project and added to the day's PDF. See safety features or start a 30-day free trial.
Crew sign-in
Print name · Signature · Time in · Time out
Frequently asked questions
Do landscapers need to call 811?
Yes, before digging, trenching for irrigation or driving stakes. Private lines such as irrigation and site lighting are usually not marked by 811, so ask the owner or general contractor where they run.
How far should people stay from a string trimmer?
This template uses 50 feet for bystanders, which matches common manufacturer guidance. Check the manual for your equipment.
This template is general safety information, not legal advice and not a complete safety program. The employer is responsible for finding the hazards on each site, training workers and meeting OSHA and state requirements. Change it to fit your job before the crew signs.
Related
- Landscaping contractors: Software for commercial landscape contractors: daily reports, plant delivery photos, irrigation tests, crew time clock, T&M tickets and pay apps.
- Heat illness prevention: Free 5-minute heat illness toolbox talk: water, rest and shade, easing new workers in, and the signs of heat exhaustion and heat stroke.
- Hazard communication (HazCom): Free 5-minute HazCom toolbox talk: safety data sheets, container labels, pictograms, PPE and spills, with discussion questions and a sign-in sheet.
- Back injury prevention and lifting: Free 5-minute safe lifting toolbox talk: planning the lift, keeping the load close, team lifts, carts and hoists, and avoiding the twist.
- Safety, JHAs & toolbox talks: Digital JHAs with crew sign-in signatures, 89 toolbox talks in English and Spanish, incident reports with OSHA recordable flags, and checklists.
Start a 30-day free trial · Pricing · Features · Free templates · Guides · By trade · By state
