A job hazard analysis for electrical crews. It covers de-energizing, running conduit and pulling wire, installing devices and panels, temporary power, and energizing and testing.

Last updated

When to use this JHA

Use this JHA for rough-in, trim-out, service work and temporary power. The first step drives everything else: find every source of energy, lock it out, and prove it is dead with a meter you have just tested. Energized work is the exception and needs its own permit and PPE.

Job steps, hazards and controls

Job stepHazardsControls
Identify energy sources and de-energizeShock; arc flash; electrocutionLockout/tagout before work; test for absence of voltage with a tested meter; energized work only with a permit
Run conduit and pull wireLadder/lift falls; strains; cutsInspect ladder before use; team pulls on heavy wire; gloves; wire-pull rope rated
Install devices, fixtures and panelsShock from mis-identified circuits; fallsVerify dead before touching; GFCI on all cords; non-conductive ladder
Temporary power on siteDamaged cords; wet locationsGFCI on all cords; assured equipment grounding program; cords inspected and kept out of water and traffic
Energize and testArc flash; shockArc-rated PPE per the panel label / NFPA 70E; qualified persons only; area cleared and communicated

Hazards to list for electrical work

Controls to put in place

PPE, permits and training

What crews most often miss

Mislabeled circuits and back-feeds catch experienced electricians. A breaker label is not proof. Test at the point of work every time, and test the meter on a known live source before and after. On pulls, plan the route and the number of people. Long, heavy pulls are where strains and pinched hands happen.

How to use this template

  1. Take this electrical work template to the work area and check each step against real conditions.
  2. Add any hazard you find that is not listed, and cross out steps that do not apply today.
  3. Review it out loud with the crew. Ask what they would add.
  4. Have everyone sign in below, and update the JHA if the work or the conditions change.

Fill out this JHA in Trakend

In Trakend, a electrical work JHA starts with these steps, hazards and controls already filled in. The foreman adjusts it on a phone, the crew signs on the screen with time in and time out, and the signed JHA is saved to the project and added to the day's PDF. See safety features or start a 30-day free trial.

Crew sign-in

Print name · Signature · Time in · Time out

Frequently asked questions

What does "test for absence of voltage" mean?

After locking out the circuit, use a properly rated meter to confirm there is no voltage at the point of work. Check the meter on a known live source before and after so you know it was working.

Is GFCI protection required for temporary power?

OSHA requires ground-fault protection for temporary power on construction sites, using either GFCIs or an assured equipment grounding conductor program.