Demolition JHA template
A job hazard analysis for selective and structural demolition. It covers the engineering survey, hazardous material checks, utilities, exclusion zones, the demolition sequence, breaking concrete, and load-out.
Last updated
When to use this JHA
Use this JHA for interior strip-outs, selective demolition and structure removal. Demolition has its own OSHA rules in 29 CFR 1926 Subpart T. The first of them is that a competent person does an engineering survey of the structure before work starts, so the crew knows what is holding up what.
Job steps, hazards and controls
| Job step | Hazards | Controls |
|---|---|---|
| Engineering survey and hazardous material check | Unplanned collapse; asbestos, lead, PCBs | Written engineering survey (1926.850); asbestos/lead survey before disturbing materials; stop and report suspect materials |
| Isolate utilities | Live electrical, gas, water | Lockout/tagout before work; utilities shut off and capped and confirmed |
| Set up exclusion zones and debris chutes | Falling debris onto workers or the public | Barricade drop zones; enclosed chutes for drops over 20 ft; overhead protection at entrances |
| Demolish selectively, top down | Structural collapse; struck-by; falls through openings | Follow the demolition sequence; guardrails / covers on openings; never undermine supports |
| Break concrete / masonry | Silica dust; noise; vibration; flying chips | Wet cutting / vacuum dust control; respirator per silica plan; face shield; hearing protection |
| Load out debris | Manual handling; sharp edges; equipment movement | Team lift / use dolly over 50 lbs; cut-resistant gloves; spotter for backing equipment |
Hazards to list for demolition
- Structural collapse
- Falls from height
- Struck-by hazards
- Overhead hazards
- Silica dust
- Asbestos
- Lead exposure
- Noise exposure
- Electrical hazards
- Manual handling/ergonomic
- Slips/trips
Controls to put in place
- Lockout/tagout before work
- Guardrails / covers on openings
- Wet cutting / vacuum dust control
- Respirator per silica plan
- Hearing protection in high-noise areas
- Team lift / use dolly over 50 lbs
- Engineering survey before demolition
- Barricade drop zones
- Pre-task briefing with crew
- Keep walkways clear (housekeeping)
PPE, permits and training
- Standard site PPE: Hard hat, Safety glasses (ANSI Z87.1), Steel-toed boots, High-visibility vest, Safety gloves.
- Added for demolition: Face shield, Respirator, Hearing protection (plugs/muffs), Coveralls/disposable coveralls, Barricades/safety cones, Lockout/tagout devices.
- Permits and plans: Lockout/Tagout, Asbestos Work Plan
- Training to verify: Asbestos Awareness, Lead Awareness, Silica Awareness, Respiratory Protection, Lockout/Tagout.
What crews most often miss
The unknowns are what hurt people in demolition: a wall that turns out to be load-bearing, a line that is still live, or old material that contains asbestos or lead. If the crew finds something that was not in the survey, or a suspect material, stop and report it. Do not let the schedule decide.
How to use this template
- Before the crew starts, look at the actual work area and check it against the steps listed for demolition.
- Add any hazard you find that is not listed, and cross out steps that do not apply today.
- Review it out loud with the crew. Ask what they would add.
- Have everyone sign in below, and update the JHA if the work or the conditions change.
Fill out this JHA in Trakend
In Trakend, a demolition JHA starts with these steps, hazards and controls already filled in. The foreman adjusts it on a phone, the crew signs on the screen with time in and time out, and the signed JHA is saved to the project and added to the day's PDF. See safety features or start a 30-day free trial.
Crew sign-in
Print name · Signature · Time in · Time out
Frequently asked questions
Is an engineering survey required before demolition?
Yes. OSHA 1926.850 requires a competent person to make an engineering survey of the structure before demolition starts, to check the condition of the framing, floors and walls and the chance of an unplanned collapse.
When do we have to check for asbestos or lead?
Before disturbing materials that could contain them, which is common in older buildings. This is normally handled with a survey by a qualified person before demolition begins.
This template is general safety information, not legal advice and not a complete safety program. The employer is responsible for finding the hazards on each site, training workers and meeting OSHA and state requirements. Change it to fit your job before the crew signs.
Related
- Demolition contractors: Software for demolition contractors: engineering survey and utility shutoff records, JHAs, before photos, load-out logs, T&M tickets and pay apps.
- Silica dust exposure: Free 5-minute silica dust toolbox talk: where silica comes from, wet cutting, vacuums, Table 1, respirators, and why you never dry sweep.
- Lockout/tagout (LOTO): Free 5-minute lockout/tagout toolbox talk: energy sources, one lock per person, verifying zero energy, and safe restart, with a sign-in sheet.
- Concrete saw cutting and coring: Free concrete saw cutting and coring JHA: scanning for embeds, silica dust controls under Table 1, kickback, slurry, and safe removal of cut sections.
- Safety, JHAs & toolbox talks: Digital JHAs with crew sign-in signatures, 89 toolbox talks in English and Spanish, incident reports with OSHA recordable flags, and checklists.
Start a 30-day free trial · Pricing · Features · Free templates · Guides · By trade · By state