Glazing and curtain wall JHA template

A job hazard analysis for glaziers. It covers receiving and staging glass, lifting and setting units, working at openings and from lifts or swing stages, and sealing.

Last updated

When to use this JHA

Use this JHA for storefront, windows, curtain wall and interior glass. Glass is heavy, sharp and awkward, and it is usually installed at the edge of the building. Plan how each unit gets from the truck to the opening, and what happens below while it is being set.

Job steps, hazards and controls

Job stepHazardsControls
Receive and stage glassBreakage; cuts; tip-over of glass racksSecure racks; cut-resistant gloves and sleeves; never carry glass flat over your head
Lift and set units (suction cups, glass lifters, cranes)Dropped glass; struck-by; caught-betweenInspect vacuum cups before each use; enough hands or mechanical lift; tag lines; stay clear of suspended loads
Work at openings and from lifts / swing stagesFalls from height100% tie-off above 6 ft; aerial lift harness; guardrails at open edges
Seal and caulkChemical exposureSDS reviewed for chemicals used; gloves

Hazards to list for glazing and curtain wall installation

Controls to put in place

PPE, permits and training

What crews most often miss

Wind turns a large lite into a sail. Agree on a wind limit for setting glass and stop when it is reached. Inspect vacuum cups and lifters before each use, because a slow leak is hard to see until the glass slips. Keep the area below barricaded, since a dropped unit or tool falls a long way.

How to use this template

  1. Before the crew starts, look at the actual work area and check it against the steps listed for glazing and curtain wall installation.
  2. Add any hazard you find that is not listed, and cross out steps that do not apply today.
  3. Review it out loud with the crew. Ask what they would add.
  4. Have everyone sign in below, and update the JHA if the work or the conditions change.

Fill out this JHA in Trakend

In Trakend, a glazing and curtain wall installation JHA starts with these steps, hazards and controls already filled in. The foreman adjusts it on a phone, the crew signs on the screen with time in and time out, and the signed JHA is saved to the project and added to the day's PDF. See safety features or start a 30-day free trial.

Crew sign-in

Print name · Signature · Time in · Time out

Frequently asked questions

What PPE do glaziers need?

Cut-resistant gloves and sleeves for handling glass, along with standard site PPE. Add fall protection when working at openings, on lifts or on swing stages.

How should glass be stored on site?

On racks or A-frames made for glass, secured so the load cannot tip, on level ground and out of traffic paths.

This template is general safety information, not legal advice and not a complete safety program. The employer is responsible for finding the hazards on each site, training workers and meeting OSHA and state requirements. Change it to fit your job before the crew signs.