Home › Free templates › JHA templates › Flooring and tile

Flooring and tile JHA template

A job hazard analysis for flooring and tile installers. It covers floor prep, cutting, adhesives and setting, and carrying and staging material.

Last updated

When to use this JHA

Use this JHA for tile, resilient flooring, carpet, wood and floor coatings. The big exposures are dust from grinding and cutting, vapors from adhesives and coatings, and years of kneeling. On remodels, find out what is in the old floor and mastic before anyone scrapes or grinds it.

Job steps, hazards and controls

Job stepHazardsControls
Prep the floor (grinding, scraping, leveling)Silica dust; noise; old adhesives may contain asbestosWet cutting / vacuum dust control; check old mastic/tile for asbestos before removal; hearing protection
Cut tile and flooringSilica dust from tile saws; cutsWet tile saw per Table 1; guards in place; GFCI on all cords; cut-resistant gloves
Spread adhesives and set materialSolvent vapors; skin irritation; knee injuriesSDS reviewed for chemicals used; ventilate; knee pads; rotate tasks
Carry and stage materialsBack strainTeam lift / use dolly over 50 lbs

Hazards to list for flooring and tile installation

Controls to put in place

PPE, permits and training

What crews most often miss

Old flooring is the trap. Some older floor tile and black mastic contain asbestos, and grinding or sanding them spreads fibers through the building. If the age of the floor is unknown, have it checked before removal. With adhesives and coatings, ventilate the room and keep ignition sources out when the product is flammable.

How to use this template

  1. Walk the work area first and compare what you see with the flooring and tile installation steps above.
  2. Add any hazard you find that is not listed, and cross out steps that do not apply today.
  3. Review it out loud with the crew. Ask what they would add.
  4. Have everyone sign in below, and update the JHA if the work or the conditions change.

Fill out this JHA in Trakend

In Trakend, a flooring and tile installation JHA starts with these steps, hazards and controls already filled in. The foreman adjusts it on a phone, the crew signs on the screen with time in and time out, and the signed JHA is saved to the project and added to the day's PDF. See safety features or start a 30-day free trial.

Crew sign-in

Print name · Signature · Time in · Time out

Frequently asked questions

Can old floor tile contain asbestos?

Yes. Some older resilient floor tile, sheet flooring backing and adhesives contain asbestos. Have suspect materials checked before removing, sanding or grinding them.

How do you control silica dust when cutting tile?

Use a wet tile saw that feeds water to the blade, or tools with a shroud and vacuum dust collection, as Table 1 of OSHA 1926.1153 describes for the tool you are using.

This template is general safety information, not legal advice and not a complete safety program. The employer is responsible for finding the hazards on each site, training workers and meeting OSHA and state requirements. Change it to fit your job before the crew signs.

Related

Start a 30-day free trial · Pricing · Features · Free templates · Guides · By trade · By state