Monthly pay applications built from your schedule of values
Billing day should not mean rebuilding a spreadsheet. In Trakend each pay application starts from the approved schedule of values, brings forward everything billed before, adds approved change orders, works out retainage and prints a G702/G703-style PDF you can send for signature.
Last updated
Why billing spreadsheets break
A pay application is simple arithmetic repeated across many lines, and that is exactly where spreadsheets fail. Someone copies last month's file and forgets to move this period into previous. A formula is typed over. A change order is added to the summary but not the continuation sheet. The owner's accountant finds the error, the application is sent back, and payment slips a month.
The numbers also need a history. When the owner asks what was billed on a line in March, the answer should not depend on finding the right file.
How one billing period works
- Trakend creates the draft from the approved schedule of values. Previous applications roll forward on their own.
- For each line, enter percent complete or a dollar amount for this period. Stored materials have their own column and cannot exceed what is left on the line.
- Approved and executed owner change orders appear as their own lines, ready to bill.
- Retainage is calculated from the project rate, or from the rate on a line if you set one. Released retainage is entered in the period it is released.
- Totals for the application summary are worked out for you: contract sum to date, completed and stored to date, retainage, previous certificates and current payment due.
Statuses that protect the numbers
A pay application is draft, submitted, approved, paid, rejected or sent back for revision. When it is approved the numbers lock and the continuation sheet lines are frozen, so a change order approved later cannot alter a PDF that has already been filed. The next application picks up from the locked totals.
The PDF and the signed copy
Trakend renders the PDF on the server: an application summary in the G702 style and a continuation sheet in the G703 style, with an architect or engineer certificate block and an optional notary block. The file is saved in the project's Files automatically. When the signed copy comes back, upload it to the same pay application so the record is complete.
Trakend is not affiliated with the AIA and does not supply official AIA Contract Documents. If your contract requires the official forms, use your licensed copies and keep Trakend as the working record.
Who does what
The project manager or the office enters the period's progress, usually after walking the job with the superintendent. A person with approval rights approves it. Subcontractors on your project submit their own pay applications to you the same way. Billing screens are hidden from foremen and workers by default.
It replaces the billing workbook, the folder of old versions and the hand-typed summary page. For the basics of the forms themselves, read how G702 and G703 pay applications work.
Frequently asked questions
Can I bill by percent complete or by dollar amount?
Either. Each line can be billed by percent or by dollars for the period, and stored materials are entered separately.
Do I need a schedule of values first?
Yes. An approved schedule of values is required before the first pay application. That keeps the line items the same from month to month.
Are these official AIA forms?
No. Trakend produces G702/G703-style PDFs. It is not affiliated with the AIA and does not supply official AIA Contract Documents.
Can I change a pay application after it is approved?
Approved numbers are locked. If something is wrong, the application has to be sent back for revision by someone with the right to do that.
This page is general information about a software tool. It is not legal, tax or accounting advice, and your contract decides which billing forms you must use.
Related
- Schedule of values: Build a schedule of values by hand or from your cost-code budget, set retainage per line, get it approved once, and bill from it every month.
- Retainage tracking: Track retainage held on every pay application line, override the rate where the contract says so, release it in any period, and see what subs are owed.
- Change orders: Price change orders with your own overhead and profit rules, keep owner and sub change orders in separate logs, and bill them on the next pay app.
- Lien waivers: Generate the four Texas statutory lien waiver forms from a pay application, upload the signed copy, and get a warning before paying a sub with no waiver.
- Pay application: A pay application is the contractor’s periodic request for payment, based on work completed against the schedule of values. Example and mistakes.
- How G702/G703 pay apps work: How a G702/G703 pay application works: the schedule of values, the continuation sheet columns, retainage, stored materials and the summary math.