Monthly pay applications built from your schedule of values

Billing day should not mean rebuilding a spreadsheet. In Trakend each pay application starts from the approved schedule of values, brings forward everything billed before, adds approved change orders, works out retainage and prints a G702/G703-style PDF you can send for signature.

Last updated

Why billing spreadsheets break

A pay application is simple arithmetic repeated across many lines, and that is exactly where spreadsheets fail. Someone copies last month's file and forgets to move this period into previous. A formula is typed over. A change order is added to the summary but not the continuation sheet. The owner's accountant finds the error, the application is sent back, and payment slips a month.

The numbers also need a history. When the owner asks what was billed on a line in March, the answer should not depend on finding the right file.

How one billing period works

Statuses that protect the numbers

A pay application is draft, submitted, approved, paid, rejected or sent back for revision. When it is approved the numbers lock and the continuation sheet lines are frozen, so a change order approved later cannot alter a PDF that has already been filed. The next application picks up from the locked totals.

The PDF and the signed copy

Trakend renders the PDF on the server: an application summary in the G702 style and a continuation sheet in the G703 style, with an architect or engineer certificate block and an optional notary block. The file is saved in the project's Files automatically. When the signed copy comes back, upload it to the same pay application so the record is complete.

Trakend is not affiliated with the AIA and does not supply official AIA Contract Documents. If your contract requires the official forms, use your licensed copies and keep Trakend as the working record.

Who does what

The project manager or the office enters the period's progress, usually after walking the job with the superintendent. A person with approval rights approves it. Subcontractors on your project submit their own pay applications to you the same way. Billing screens are hidden from foremen and workers by default.

It replaces the billing workbook, the folder of old versions and the hand-typed summary page. For the basics of the forms themselves, read how G702 and G703 pay applications work.

Frequently asked questions

Can I bill by percent complete or by dollar amount?

Either. Each line can be billed by percent or by dollars for the period, and stored materials are entered separately.

Do I need a schedule of values first?

Yes. An approved schedule of values is required before the first pay application. That keeps the line items the same from month to month.

Are these official AIA forms?

No. Trakend produces G702/G703-style PDFs. It is not affiliated with the AIA and does not supply official AIA Contract Documents.

Can I change a pay application after it is approved?

Approved numbers are locked. If something is wrong, the application has to be sent back for revision by someone with the right to do that.

This page is general information about a software tool. It is not legal, tax or accounting advice, and your contract decides which billing forms you must use.