A submittal register that warns you before long-lead items are late
Submittals decide when material can be ordered, and material decides the schedule. Trakend's submittal register tracks each item from draft to approved, counts back from the day it is needed on site, and tells you which ones have to move this week.
Last updated
Approved on time, ordered too late
The usual submittal log is a list of names and statuses. It tells you that the switchgear submittal is under review. It does not tell you that switchgear takes months to arrive and that the review has already used up most of the spare time you had. People find that out when the electrician asks where the gear is. A register that only records status is a history book. What a project team needs is a warning.
The other time sink is the package. Someone collects cut sheets from old emails, builds a cover page in a word processor and merges PDFs by hand, for every submittal on the job.
Set up the whole register in one sitting
At the start of a job, paste a list of spec sections or upload a CSV and Trakend creates up to 200 draft submittals at once. Each one then gets a type: shop drawings, product data, samples, mock-ups, design data, test reports, certificates or other. Add a spec section, priority, due date, a reviewer and a ball-in-court person.
Order-by dates from lead times
For each item, enter the date it is needed on site and its lead time in days. Trakend works out the order-by date. The register flags items that are already late and items due within 7 days, so the weekly meeting starts with the short list that matters. The register table shows number, title, spec section, needed-on-site date, status and ball in court, and exports to CSV.
Review status and resubmittals
- Statuses: draft, submitted, under review, approved, approved as noted, revise and resubmit, rejected and closed.
- A revision number that you raise on each resubmittal, so the history of a difficult item stays on one record.
- Upload the stamped copy that comes back from the reviewer and keep it with the submittal.
- A notification when a submittal is assigned, and an email when one comes back revise and resubmit or rejected, because those are the ones that cost time.
Packages and a datasheet library
Build the package with one click. Trakend makes a cover page and merges every attached PDF behind it into a single file to download or email. For products you submit on job after job, a company-wide library of datasheets lets you attach the cut sheet in seconds instead of searching for it again.
Who works the register
Project engineers and project managers run it. Subcontractors invited to the project create their own submittals free, and the GC reviews them. Superintendents mostly read it, to know what is approved for installation, and the due dates also appear on the company calendar.
It replaces the submittal spreadsheet, the hand-built cover sheet and the shared folder of product data. Not sure whether something should be a submittal or a question? Read RFI vs submittal or the RFI tracking page.
Frequently asked questions
Can I create many submittals at once?
Yes. Paste a list of spec sections or upload a CSV to create up to 200 draft submittals in one step.
How does Trakend calculate the order-by date?
From the needed-on-site date and the lead time in days that you enter. Items that are late or due within 7 days are flagged.
Can I send a submittal as a single PDF?
Yes. The package builder adds a cover page and merges every attached PDF into one file.
Where does the reviewer's stamped copy go?
Upload it to the same submittal, so the returned copy sits with the original and its revision history.
Related
- RFI tracking: Keep one numbered RFI log per project with a reviewer, ball in court, due dates, overdue flags, cost and schedule impact, drawing pins and PDF export.
- RFIs & submittals: Track RFIs and submittals with auto-numbering, ball-in-court, due dates, lead-time order-by dates, drawing pins and combined PDF packages.
- Gantt chart schedule: Build the project schedule as a Gantt chart: drag bars, link tasks with lag days, set milestones, save a baseline and export a PDF for the meeting.
- Submittal: A submittal is a package the contractor sends for approval before buying or building: shop drawings, product data or samples. Example and mistakes.
- Submittal log: A submittal log, or submittal register, lists every required submittal with its spec section, dates and status. Example, mistakes and related terms.
- RFI vs submittal: RFI vs submittal explained: an RFI asks a question about the documents, a submittal asks for approval of what you plan to install. When to use each.
Start a 30-day free trial · Pricing · Features · Free templates · Guides · By trade · By state