A submittal register that warns you before long-lead items are late

Submittals decide when material can be ordered, and material decides the schedule. Trakend's submittal register tracks each item from draft to approved, counts back from the day it is needed on site, and tells you which ones have to move this week.

Last updated

Approved on time, ordered too late

The usual submittal log is a list of names and statuses. It tells you that the switchgear submittal is under review. It does not tell you that switchgear takes months to arrive and that the review has already used up most of the spare time you had. People find that out when the electrician asks where the gear is. A register that only records status is a history book. What a project team needs is a warning.

The other time sink is the package. Someone collects cut sheets from old emails, builds a cover page in a word processor and merges PDFs by hand, for every submittal on the job.

Set up the whole register in one sitting

At the start of a job, paste a list of spec sections or upload a CSV and Trakend creates up to 200 draft submittals at once. Each one then gets a type: shop drawings, product data, samples, mock-ups, design data, test reports, certificates or other. Add a spec section, priority, due date, a reviewer and a ball-in-court person.

Order-by dates from lead times

For each item, enter the date it is needed on site and its lead time in days. Trakend works out the order-by date. The register flags items that are already late and items due within 7 days, so the weekly meeting starts with the short list that matters. The register table shows number, title, spec section, needed-on-site date, status and ball in court, and exports to CSV.

Review status and resubmittals

Packages and a datasheet library

Build the package with one click. Trakend makes a cover page and merges every attached PDF behind it into a single file to download or email. For products you submit on job after job, a company-wide library of datasheets lets you attach the cut sheet in seconds instead of searching for it again.

Who works the register

Project engineers and project managers run it. Subcontractors invited to the project create their own submittals free, and the GC reviews them. Superintendents mostly read it, to know what is approved for installation, and the due dates also appear on the company calendar.

It replaces the submittal spreadsheet, the hand-built cover sheet and the shared folder of product data. Not sure whether something should be a submittal or a question? Read RFI vs submittal or the RFI tracking page.

Frequently asked questions

Can I create many submittals at once?

Yes. Paste a list of spec sections or upload a CSV to create up to 200 draft submittals in one step.

How does Trakend calculate the order-by date?

From the needed-on-site date and the lead time in days that you enter. Items that are late or due within 7 days are flagged.

Can I send a submittal as a single PDF?

Yes. The package builder adds a cover page and merges every attached PDF into one file.

Where does the reviewer's stamped copy go?

Upload it to the same submittal, so the returned copy sits with the original and its revision history.