A request for information is a question that is holding up work. The useful thing to know about any RFI is who has to act next and how long they have had it. Trakend keeps every RFI on a project in one numbered log built around that question.
Last updated
The question that sat in an inbox for two weeks
A foreman finds a conflict between the structural and mechanical drawings. He tells the superintendent, who emails the project manager, who forwards it to the architect. Then everyone goes back to work and assumes someone else is following up. Two weeks later the crew reaches that area, and there is still no answer.
The spreadsheet log does not help much. It is updated when somebody has time, it lives on one person's computer, and the field never sees it.
What each RFI records
- A number assigned automatically for the project. Numbers are never reused, even if an RFI is deleted. An admin picks the format once for the company: a plain RFI number, a project-name prefix or your project number.
- Subject, the question itself, priority from low to urgent, and a due date.
- Spec section and drawing reference.
- A reviewer, and a ball-in-court person.
- Cost impact and schedule impact flags, each with a dollar amount or a number of days.
- Photos and attached files.
Ball in court moves by itself
When an RFI is opened, the ball is in the reviewer's court. When it is answered, the ball goes back to the person who asked, so they know to read the answer and close it. If the due date passes without an answer, the RFI shows an overdue badge. Filter chips at the top of the log narrow it to draft, open, answered, closed or void, and each RFI keeps a timeline of its status changes. The glossary explains ball in court if the phrase is new to someone on the team.
Start the question on the drawing
From the plan viewer, drop a pin on the exact spot and create a quick RFI from it. The RFI then carries a small picture of the sheet with the pin, and a link that opens the sheet at that location. Numbered markers stay on the drawing, so the next person looking at that area can see an open question before building over it. More on the viewer in drawing markup and measuring.
Getting it to the design team
Many architects and engineers will not sign in to a contractor's software, and they do not have to. Every RFI exports to a PDF with your logo and its photos. Send PDF emails it as an attachment, with the recipient list already filled in from the GC contact, the project's distribution list and the ball-in-court person. Inside your own team, the reviewer and the ball-in-court person are notified in the app, by push and by email.
Who writes RFIs
Superintendents and foremen raise them from the field, often from the phone app, where an RFI written with no signal is saved and sent later. Project managers and project engineers manage the log. Subcontractors you invite to the job can create RFIs free and can edit only their own drafts. You can also ask Maya, the AI assistant, to draft an RFI or to list the ones still open.
It replaces the spreadsheet log and the email chain. When an answer changes cost, the impact flag is your cue to start a change order.
Frequently asked questions
Can I choose how RFIs are numbered?
Yes. An admin picks a company-wide format: a simple RFI number, a project-name prefix or the project number. Numbers are never reused.
How do I know an RFI is late?
An overdue badge appears when the due date passes with no answer, and the log can be filtered to open RFIs.
Does the architect need a Trakend account to answer?
No. You can email the RFI as a PDF and record the answer in Trakend when it comes back.
Can subcontractors submit RFIs?
Yes. Subcontractors invited to the project create RFIs at no cost, and the GC reviews and answers them.
Related
- Submittal tracking: Run the submittal register in one place: bulk setup from spec sections, review status, revisions, order-by dates from lead times and PDF packages.
- Drawing markup and measuring: Mark up construction drawings on a phone or tablet, measure distance, area and perimeter to scale, and drop RFI pins. Each person has their own layer.
- RFIs & submittals: Track RFIs and submittals with auto-numbering, ball-in-court, due dates, lead-time order-by dates, drawing pins and combined PDF packages.
- RFI (request for information): An RFI (request for information) is a written question about the drawings or specs. See an example, common mistakes and how RFIs are tracked.
- RFI log: An RFI log is the running list of every request for information on a project, with dates, status and who has to answer. Example and common mistakes.
- RFI vs submittal: RFI vs submittal explained: an RFI asks a question about the documents, a submittal asks for approval of what you plan to install. When to use each.
Start a 30-day free trial · Pricing · Features · Free templates · Guides · By trade · By state