Punch list tracking from the first walk to verified

The end of a job is when the list of small things gets long: a scratched door, a missing cover plate, paint touch-up on level three. Trakend keeps every punch item in the project with a photo, a pin on the drawing, a person responsible and a due date, and it shows what is fixed and what has been checked.

Last updated

Why punch lists drag on

Most punch lists start as handwriting on a set of plans or a spreadsheet typed up after the walk. The list is emailed to ten subcontractors. Two weeks later there are four versions of it, nobody knows which items are done, and the superintendent walks the building again just to find out. The work itself is small. Keeping track of it is what takes the time.

A punch list needs three things to finish: each item has one owner, everyone can see the same list, and someone confirms the fix before the item is closed.

Organized by phase

Punch lists in Trakend are split into phases that you name, such as Framing, Drywall or Final Walk-Through. That means the tool is useful long before closeout: a pre-drywall walk gets its own phase, with its own notes and linked drawings. Each phase shows a percent complete, so you can see at a glance how close an area is to done.

A phase can have watchers and assignees. They can be your employees, vendors, or any email address.

What goes on each item

Four statuses, and a real sign-off

Items move from Open to In Progress to Resolved to Verified. Resolved means the person doing the work says it is fixed. Verified means someone went and looked. Trakend records who verified the item and when, which is the part most paper lists skip.

The assignee is notified when an item is assigned to them. When an item is marked Resolved, the watchers and the person who created it are told it is ready for review, and they are told again when it is verified. Nobody has to send a status email.

Who uses it, and what it does not do yet

Superintendents and project engineers create items during the walk, in the web app on a tablet, a laptop or a phone browser. Foremen work their items and mark them Resolved. The PM watches the percent complete by phase. Who can change a status follows each person's permissions, and punch lists have their own permission setting separate from inspection checklists.

To be plain about limits: today the punch list lives on screen and does not export to a PDF. If the owner needs a printed list at substantial completion, plan for that. Free subcontractor portal accounts do not open the punch list today, so your own team runs the list and records the fixes.

What it replaces

It replaces the marked-up plan set, the spreadsheet with a 'done?' column, and the reply-all email chain. Because the pin sits on the current sheet in the plan viewer, the person fixing the item walks straight to it. The punch list is included on every plan, alongside task boards for to-dos that are not punch items.

Frequently asked questions

What is the difference between Resolved and Verified?

Resolved means the person responsible says the item is fixed. Verified means someone checked the fix and accepted it. Trakend records who verified each item and when.

Can I pin a punch item to a drawing?

Yes. Pick the sheet and drop a pin on the spot. The item keeps the link to the drawing so the person fixing it can find the location.

Can I use the punch list before closeout?

Yes. Lists are organized by phases you name, so you can run a framing walk, a pre-drywall walk and a final walk-through as separate phases on the same project.

Can I export the punch list to PDF?

Not today. The punch list is viewed and updated on screen in Trakend. If your contract calls for a printed list, plan for that separately.