Home › All features › Feature guide › Drawing revisions
Drawing revisions where the current sheet is the only one people open
Building from an outdated drawing is one of the most expensive mistakes on a jobsite, and one of the easiest to make. Trakend puts each new sheet on top of the old one automatically, so the field always opens the current revision and the office can still prove what an earlier one said.
Last updated
The superseded sheet in the gang box
An addendum changes four sheets. The office prints them, and three of the four make it to the plan table. A foreman who took a photo of the old sheet last month builds from his photo. The work has to be torn out and done again, and nobody budgeted for that.
Keeping sets current by hand is a full task. Someone has to rename files, move old ones into a superseded folder, and tell every person and every subcontractor that something changed. It works until the week that person is on holiday.
Same sheet number, next revision
The rule in Trakend is easy to remember. When you upload a sheet whose number already exists on the project, it is filed as the next revision of that sheet and becomes the current one. Revisions are lettered A, B, C and so on, continuing to AA after Z. Nobody has to rename a file or move the old one.
The earlier versions are not thrown away. They stay in the sheet's revision history, in order. If a question comes up later about what the drawing showed on the day the work went in, you can open that revision and see.
Whole sets, not one page at a time
- Upload a multi-page PDF, such as a full addendum or a reissued discipline. Large files upload in chunks, which helps on a slow jobsite connection.
- Trakend goes through the package page by page and reads each sheet's number, title, discipline and revision from the title block. When the text in the PDF is not clear, or the sheet is a scan, Maya reads the title block instead.
- You review each page and correct anything that was read wrong before confirming. A sheet is never filed under a number you did not approve.
- Sheets whose numbers match existing ones become new revisions. Sheets with new numbers are added to the set.
Sets, disciplines and the phone in the field
Sheets can be grouped into named, color-coded drawing sets, for example the permit set and the construction set, and filtered by discipline. Everyone on the project opens the same list in the web app or the iPhone, iPad and Android apps, so there is no separate field copy to fall behind. Subcontractors you invite see the same current sheets without paying for a user.
What carries over and what you should check
A sheet keeps its place in the set when a new revision arrives, so the RFI pins and punch list pins dropped on it are still there. A pin that was placed on an older revision is labelled with the revision it came from, for example pinned from Rev A. That label is your cue to look at the open question again and confirm the new issue answers it. See drawing markup and measuring for how markup layers work, and RFI tracking for the pins.
Trakend controls versions of the drawings you upload. It does not compare two revisions and highlight the differences for you, so keep using the revision clouds from the design team.
Who keeps the set current
Usually a project engineer or project manager uploads new issues. Superintendents, foremen and subs only ever view. It replaces the superseded folder, the stamp that says VOID and the weekly email that begins with the words please destroy all previous copies. Related terms in the glossary: addendum and ASI.
Frequently asked questions
How does Trakend know a sheet is a new revision?
By its sheet number. Uploading a sheet with a number that already exists on the project files it as the next revision and makes it current.
Can I still see old revisions?
Yes. Every earlier version stays in the sheet's revision history.
Does it work with scanned drawings?
Yes. When a sheet has no readable text, Maya reads the title block, and you confirm each page before it is filed.
Does Trakend compare two revisions automatically?
No. It keeps the versions in order and makes the newest one current. It does not highlight what changed between them.
Related
- Drawing markup and measuring: Mark up construction drawings on a phone or tablet, measure distance, area and perimeter to scale, and drop RFI pins. Each person has their own layer.
- Plans & drawings: Upload a drawing set once. Trakend splits it into sheets, reads sheet numbers, tracks revisions, and lets your team mark up and measure.
- RFI tracking: Keep one numbered RFI log per project with a reviewer, ball in court, due dates, overdue flags, cost and schedule impact, drawing pins and PDF export.
- Files: One file manager for every job: folders that fill themselves from reports, pay apps and RFIs, plus your own uploads, previews and share links.
- Addendum: An addendum is a written change or clarification to the bid documents issued before the contract is signed. Example, common mistakes, related terms.
- As-built drawings: As-built drawings are the plans marked up to show how the work was really installed. See an example, common mistakes and related closeout terms.