Home › Trades › Plumbing contractors
Construction software for plumbing contractors
Plumbing happens in phases, such as underground, rough-in, top-out and trim, with an inspection and a test at the end of each. Trakend keeps the record of every phase with the job, along with the crew's hours and the billing.
Last updated
Work that gets buried and covered
Most of a plumber's work ends up under a slab or inside a wall. Once it is covered, the only proof of what was installed and how it tested is the record made at the time. When a leak shows up a year later, or the slab crew breaks a line, the photos and the test record decide who pays.
Plumbers also depend on coordination: sleeves and penetrations, overhead space, and other trades staying off the pipe.
JHAs and toolbox talks for plumbers
Start from the plumbing JHA and add the trench or ladder work for the day.
- Trenches for underground: see the trenching JHA
- Torch work inside walls and above ceilings, with a hot work permit and fire watch
- Solvent cement and primer vapors in closed spaces
- Pressure tests: caps and plugs that can blow off
- Sewage, crawl spaces and pits
- Overhead work from ladders and lifts
What goes on a plumbing daily report
Record the phase, the area and the test, every day.
- Crew and hours by building, floor or unit
- Footage and fixtures installed, and which areas are complete
- Tests: water, air or head test, pressure and how long it held, and who witnessed it
- Inspections called, passed or failed, with the correction
- Damage by other trades, with photos before repair
- Photos of underground and in-wall piping before cover
Submittals, RFIs and coordination
Fixtures, water heaters, pumps and specialty valves all need approved submittals before they are ordered. Trakend's submittal register tracks each one by spec section, status and reviewer, and turns lead times into order-by dates. Keep your standard cut sheets in the datasheet library so the same product data attaches to the next job in seconds. When the drawings do not show how to route around a beam, pin an RFI to the spot on the sheet.
T&M tickets and change orders for plumbers
Extra plumbing work is often a repair to something another trade damaged, an added fixture, or rerouting around a clash. These get done on a verbal "just take care of it". Write the T&M ticket before the wall closes, with labor, fittings and pipe, and have it signed on screen.
Signed tickets become change orders, and approved change orders go onto the next G702/G703-style pay application with your schedule of values and retainage.
Hours and equipment
Crews clock in on a phone or a jobsite kiosk tablet with GPS fences, and approved hours export to common payroll providers. Track press tools, threaders, drain machines, cameras, locators and lifts, both owned and rented, with service and rental return reminders.
What Trakend costs
Trakend is a flat monthly price, not a per-user fee: $299 for 5 users, $749 for 20, $1,299 for 50, $1,999 for 100 and $2,499 for unlimited users. Every plan has every feature and unlimited storage (fair use). Crew members who only use the time clock are free. Plumbing contractors can try it free for 30 days. See pricing.
Frequently asked questions
Can I record pressure tests and inspections?
Yes. Note the test and the result in the daily report's inspections field, attach photos of the gauge, and use a checklist if you want a signed pass or fail record.
How do I bill for repairing another trade's damage?
Take photos, write a T&M ticket with the labor and materials, get the general contractor's superintendent to sign it on screen, and convert the signed ticket into a change order.
Can plumbers on a general contractor's project use Trakend for free?
Yes. Subcontractors invited to a general contractor's Trakend project work in that project at no cost. To run your own company's jobs and billing you need your own plan.
Related
- Plumbing: Free plumbing JHA: isolating water and gas, soldering and solvent cement, overhead and in-wall work, crawl spaces and sewage, and pressure tests.
- Trenching and excavation: Free trenching and excavation JHA: 811 locates, competent person inspections, protective systems at 5 ft, spoil setback, ladders and atmosphere checks.
- Fire prevention and extinguisher use: Free 5-minute toolbox talk on jobsite fire prevention and the PASS method for extinguishers: hot work, fuel storage, exits and when to get out.
- RFIs & submittals: Track RFIs and submittals with auto-numbering, ball-in-court, due dates, lead-time order-by dates, drawing pins and combined PDF packages.
- Daily reports: Fill out construction daily reports on a phone: auto weather, crews and man-hours, photos, delays. Finalize the day and email a branded PDF.
- For subcontractors: Daily reports, JHAs, T&M tickets, change orders, pay apps and crew time clock for specialty contractors. Join your GC's projects free.
Start a 30-day free trial · Pricing · Features · Free templates · Guides · By trade · By state
