Home › Trades › HVAC and mechanical contractors
Construction software for HVAC and mechanical contractors
Mechanical contractors manage the longest lead times and the heaviest picks on most jobs. Trakend tracks the submittals, the lift-day safety paperwork, the daily progress and the billing in one place.
Last updated
Long lead times and one chance to set it
A rooftop unit ordered late can hold up a whole building. An air handler that arrives before the roof is ready has to be stored, moved twice and protected. Mechanical work is a chain of dates: approval, release, delivery, crane day, startup. One slip moves everything after it.
Meanwhile the field is hanging duct and pipe in ceiling space that every other trade wants too. Coordination problems show up as rework unless they are raised early and in writing.
JHAs for mechanical crews
Use the HVAC and mechanical JHA, and add the crane and rigging JHA on pick days.
- Setting rooftop units: crane lifts and people near roof edges at the same time
- Lockout before service and startup, and waiting for fans to stop
- Overhead duct and pipe from ladders and scissor lifts
- Brazing and soldering under a hot work permit
- Refrigerant handling by certified technicians
- Sheet metal cuts
What goes on a mechanical daily report
Mechanical dailies should make it clear what is ready for the next trade and what is waiting on someone else.
- Crew and hours by floor or system
- Duct, pipe and equipment installed, by area
- Equipment deliveries, with photos of condition on arrival
- Tests and inspections: duct leakage, pipe pressure tests, above-ceiling
- Startup and balancing progress
- Clashes and areas not ready, with photos
Submittals that drive the schedule
Every piece of equipment has a submittal, and every submittal has a clock. In Trakend each submittal has a status, a reviewer and a ball-in-court. Enter the needed-on-site date and the lead time and the order-by date is worked out for you, with late items flagged. Bundle the cover page and every cut sheet into one PDF package. When a duct main will not fit under a beam, pin an RFI to that spot on the sheet so the answer is tied to the location.
Billing mechanical work
Mechanical schedules of values are heavy on equipment. Bill stored materials for units that have been delivered but not set, and percent complete for duct, pipe, insulation, controls and startup. Retainage is tracked per line and can be released when the time comes.
Added dampers, rerouted duct, premium time to make up someone else's delay: put small items on signed T&M tickets and price larger ones as change orders with separate markups for labor, materials, equipment and subcontracted work such as controls or insulation.
Crews, lifts and tools
Mechanical crews clock in by phone or kiosk tablet inside a GPS fence for each job. Track lifts, duct jacks, welders, recovery machines, vacuum pumps and press tools, with service reminders and rental return dates so a scissor lift does not stay on rent after the ceiling is closed.
Pricing for a field-heavy company
Plans start at $299 a month for 5 office and field users and go up to $2,499 a month for unlimited users, with every feature on every plan. Time-clock-only crew and subcontractors on your projects do not count as users. There is no setup fee, and hvac and mechanical contractors get a 30-day free trial. See pricing.
Frequently asked questions
Can I track equipment lead times and order-by dates?
Yes. Each submittal can carry a needed-on-site date and a lead time. Trakend calculates the order-by date and flags late items.
Can I bill for equipment that is delivered but not installed?
Yes. Pay applications include stored materials on each schedule of values line.
Can my controls or insulation sub send me their billing in Trakend?
Yes. Subcontractors you add to your project can submit their own change orders, schedule of values and pay applications to you at no cost to them.
Related
- HVAC and mechanical: Free HVAC and mechanical JHA: lockout, hanging duct overhead, setting rooftop units, brazing and refrigerant, and sheet metal cuts.
- Heavy equipment, cranes and rigging: Free crane, rigging and heavy equipment JHA: pre-use inspection, ground and outriggers, power line clearance, swing radius, rigging and signals.
- Lockout/tagout (LOTO): Free 5-minute lockout/tagout toolbox talk: energy sources, one lock per person, verifying zero energy, and safe restart, with a sign-in sheet.
- RFIs & submittals: Track RFIs and submittals with auto-numbering, ball-in-court, due dates, lead-time order-by dates, drawing pins and combined PDF packages.
- Scheduling: Drag-and-drop Gantt schedules with milestones, linked tasks and baselines, a weekly crew planner, and calendar feeds for Outlook and Google.
- Change orders & pay apps: Change orders with OH&P markup, field-signed T&M tickets, schedule of values, retainage, and G702/G703-style pay application PDFs.
Start a 30-day free trial · Pricing · Features · Free templates · Guides · By trade · By state
