Construction software for steel erectors
Steel erection is a crane, a small crew and a tight sequence. Trakend helps steel erectors document each day's picks, connections and field fixes, and turn field problems into answered RFIs and paid change orders.
Last updated
A short window and a lot riding on it
The erector is on site for a short, expensive stretch. The crane is on the clock, the fabricator's trucks are sequenced, and every other trade is waiting for the deck. When anchor bolts are out of place or a piece does not fit, the crew either stands by or fixes it in the field.
Both cost money that the erector did not price. Getting it back depends on documenting the problem before the fix hides it.
JHAs for steel erection
Steel erection has its own rules in OSHA 29 CFR 1926 Subpart R. Start from the steel erection JHA and the cranes and rigging JHA.
- Falls: protection above 15 feet, with special rules for connectors and deckers
- Hoisting: rigging inspection, tag lines, nobody under the load
- Stability: bolts in every connection before the hoist line is released
- Decking: openings, edges and loose bundles in wind
- Field welding and cutting under a hot work permit
- Dropped bolts and tools over other trades
What goes on a steel erection daily report
Tie the report to the erection sequence.
- Ironworkers, operators and hours
- Pieces set, by sequence or gridline
- Bolting and welding progress, and deck placed
- Crane on site, hours worked and hours on standby
- Deliveries from the fabricator, and missing or wrong pieces
- Fit-up problems and field fixes, with photos
- Wind and weather. Hours lost are flagged on the report
RFIs and field fixes
When a connection will not make up or an embed is in the wrong place, the engineer has to approve the fix. Open the sheet, drop a pin at the connection, and send the RFI with photos. Flag the cost and schedule impact. The answer is saved with the RFI, so when the special inspector asks who approved the field weld, it takes a minute to show.
Standby, T&M and billing
Crane and crew standby caused by others is the biggest recoverable cost in steel erection. Write a T&M ticket for the standby hours and equipment while it is happening, and have the general contractor's superintendent sign it on screen. Do the same for field fixes to fabrication errors, so the backcharge has support.
Bill erection progress by sequence or level on a G702/G703-style pay application. Approved change orders are added to the next pay app, and retainage is tracked.
Cranes, welders and rigging
Track cranes, welders, lifts, compressors and rigging in the equipment list, owned or rented, with inspection logs and service reminders by hour meter. Ironworkers clock in on a phone or kiosk tablet inside the job's GPS fence.
Pricing for a field-heavy company
Plans start at $299 a month for 5 office and field users and go up to $2,499 a month for unlimited users, with every feature on every plan. Time-clock-only crew and subcontractors on your projects do not count as users. There is no setup fee, and steel erectors get a 30-day free trial. See pricing.
Frequently asked questions
How do I document anchor bolt problems?
Photograph them, note them in the daily report, and send an RFI pinned to the location on the drawing. If the crew stands by or does corrective work, record it on a signed T&M ticket.
Can I record crane standby time?
Yes. Put the standby labor and equipment hours on a T&M ticket and get it signed on screen. The daily report's delays field records the cause.
Can the fabricator or general contractor see my RFIs?
RFIs have a reviewer and a ball-in-court, and each one can be emailed as a PDF. On a general contractor's Trakend project, subcontractors submit RFIs and the general contractor reviews and answers them.
Related
- Steel erection: Free steel erection JHA: site readiness and anchor bolts, hoisting, connecting and bolting, decking, field welding, and fall protection for ironworkers.
- Heavy equipment, cranes and rigging: Free crane, rigging and heavy equipment JHA: pre-use inspection, ground and outriggers, power line clearance, swing radius, rigging and signals.
- Crane and rigging safety: Free 5-minute crane and rigging toolbox talk: load weight, rigging inspection, signal person, power lines, tag lines and staying out from under loads.
- Fall protection: Free 5-minute fall protection toolbox talk: the 6-foot rule, guardrails, nets and harnesses, anchor points, inspections and floor openings.
- RFIs & submittals: Track RFIs and submittals with auto-numbering, ball-in-court, due dates, lead-time order-by dates, drawing pins and combined PDF packages.
- Change orders & pay apps: Change orders with OH&P markup, field-signed T&M tickets, schedule of values, retainage, and G702/G703-style pay application PDFs.