Construction software for underground utility contractors
Utility work is buried the same day it is built. Trakend helps pipe crews record footage, depths, tests and conflicts while the trench is still open, and keeps the trench safety paperwork with the job.
Last updated
If it is not recorded before backfill, it is gone
A pipe crew lays and buries hundreds of feet a day. What was installed, how deep, on what bedding, and what it crossed can only be seen for a few hours. After that, the daily report and the photos are the only record.
Utility crews also hit conflicts constantly: existing lines that are not where the plans show, or not on the plans at all. Each one stops production and usually changes the design.
Trench, tie-in and manhole JHAs
Pipe work combines several serious hazards. Use the underground utilities JHA with the trenching JHA.
- Cave-ins: trench boxes and shoring at 5 feet, and daily inspections
- Striking existing gas, electric and fiber: potholing inside the tolerance zone
- Pipe and structures swinging over the trench
- Manholes and vaults as confined spaces
- Pressure tests: plugs and caps
- Traffic, when working in the road
What goes on a utility daily report
Footage and stations, every day.
- Crew, operators and hours
- Pipe laid: size, material, footage, from station to station
- Structures set: manholes, inlets, valves, hydrants
- Bedding and backfill, compaction tests and results
- Tests: pressure, leakage, mandrel, camera, with pass or fail
- Conflicts and existing utilities found, with photos and measurements
- Inspector on site, and what was accepted
Photos as as-builts
Take a photo of every crossing, fitting and tie-in before backfill, with a tape or grade rod in the shot. Photos are stored at full resolution by project and date, and attach to that day's report. When the general contractor asks for as-built information, or another contractor hits your line later, you can pull the day and the photo.
Conflicts, T&M and unit-price pay apps
When an unmarked line stops the crew, the clock starts on a change. Send an RFI with photos, and track the standby and the extra work on a T&M ticket signed by the inspector or superintendent on your phone. Rock, dewatering and unsuitable trench bottom are handled the same way.
Most utility contracts are unit price. Build the schedule of values with one line for each bid item and bill by dollar amount as footage is installed. Retainage and approved change orders are carried forward on each pay application.
Equipment and trench safety gear
Track excavators, loaders, compactors, pumps, lasers, trench boxes and shoring, owned and rented, with rental return reminders. The trench and excavation daily log records the competent person's inspections, and time is tracked by GPS fence for each job.
What Trakend costs
Trakend is a flat monthly price, not a per-user fee: $299 for 5 users, $749 for 20, $1,299 for 50, $1,999 for 100 and $2,499 for unlimited users. Every plan has every feature and unlimited storage (fair use). Crew members who only use the time clock are free. Underground utility contractors can try it free for 30 days. See pricing.
Frequently asked questions
Can I record footage by station each day?
Yes. Put stations, footage, pipe size and structures in the daily report's work description, with photos. Every report is saved by date and exports to PDF.
How do I handle an unmarked utility conflict?
Photograph it, note it in the daily report, send an RFI for direction, and record standby and extra work on a signed T&M ticket.
Does Trakend have a confined space permit?
Trakend includes a confined space entry permit form you can fill out and sign on a phone, plus a confined space JHA template.
Related
- Underground utilities: Free underground utility JHA: potholing existing lines, trench protection, setting pipe and structures, tie-ins, manhole entry and pressure tests.
- Trenching and excavation: Free trenching and excavation JHA: 811 locates, competent person inspections, protective systems at 5 ft, spoil setback, ladders and atmosphere checks.
- Confined space entry: Free confined space JHA: evaluating the space, the entry permit, isolation, air testing and ventilation, the attendant, and rescue readiness.
- Working near utilities: Free 5-minute toolbox talk on underground and overhead utilities: 811 locates, hand digging near marks, power line clearance and what to do after a strike.
- Excavation and earthwork contractors: Software for excavation and earthwork contractors: trench JHAs, daily reports with equipment and loads, GPS time clock, T&M tickets and pay apps.
- Change orders & pay apps: Change orders with OH&P markup, field-signed T&M tickets, schedule of values, retainage, and G702/G703-style pay application PDFs.
Start a 30-day free trial · Pricing · Features · Free templates · Guides · By trade · By state