Work permits that cannot open until every control is checked
A permit is a pause before dangerous work: stop, check the controls, put a name on it. Trakend turns that pause into a short form on the phone for hot work, confined space entry, lockout/tagout and any other permit your site uses, and it keeps asking until the permit is closed.
Last updated
How paper permits drift
Paper permits tend to fail in two ways. The first is the permit that gets signed with half the boxes blank because the welder is waiting. The second is the permit that never closes. The work ends at three, everyone leaves, and on paper the hot work or the lockout is still open the next morning. Nobody can say whether the fire watch stayed or whether the locks came off in the right order.
A wall of yellow carbon copies in the trailer does not tell a superintendent which permits are live right now.
Four kinds of permit
- Hot work: welding, cutting, grinding and other spark-producing work, with the fire watch named on the permit.
- Confined space: entry with an attendant, and air readings recorded on the permit against safe limits.
- Lockout/tagout: the energy sources being isolated, and a check that zero energy was verified before work starts.
- Other: a general permit for anything else your site controls this way.
Writing one and opening it
Permits live in the project's Site Safety tab. The person in charge describes the work and the location, sets the start and end time, lists the workers and equipment on the permit, and goes through the controls for that permit type one by one. Every control needs an answer.
Then the authorizing person signs. A permit opens only when every control has been answered and it has been signed. Once it is open it is locked, so nobody can quietly change what was agreed. Print it or save it as a PDF and post it at the work.
Bad air stops the permit
On a confined space permit, each atmospheric reading is checked against safe limits as it is entered. A reading outside the limits blocks the permit from opening and sends an urgent notification to the safety team. The form will not let a hurried crew write down a bad number and carry on.
Closing it out, and what happens if nobody does
Closing a permit takes its own signature, separate from the one that opened it. For hot work, the close screen reminds the crew about the fire watch staying after the work ends.
A permit that is still open after its end time turns into a warning on the project and on the company Safety Dashboard, and a daily reminder goes out until someone closes it. A draft that was never opened can be deleted. An opened permit stays in the record.
Who writes, who signs, who watches
Foremen and superintendents with create rights on safety write permits in the field, on a phone, a tablet or a computer. The authorizing person signs to open. Safety managers watch the open list and get the urgent alerts.
Permits sit beside the other Site Safety records for the same job and date, such as the JHA for the task and the trench log.
Paper forms are still an option
Some owners insist on their own permit form. For those, Trakend's fillable PDF forms let you upload the owner's PDF and fill and sign it on a phone. Stock versions of a hot work permit, a confined space entry permit and an excavation permit are included there. The built-in permits described on this page add the rules: the checks before opening, the lock, and the reminders.
Work permits replace the carbon-copy pad and the whiteboard list of open permits. They are part of the safety tools on every Trakend plan. For crew talks on these subjects, see the free toolbox talks on confined space entry and lockout/tagout.
Frequently asked questions
Can a permit be opened with controls left blank?
No. Every control on the permit needs an answer, and the permit must be signed before it opens.
What happens if a confined space air reading is unsafe?
The permit is blocked from opening and an urgent notification goes to the safety team. What to do next follows your own confined space program.
Can I edit a permit after it is open?
No. An open permit is locked. Close it, and write a new permit if the work or the conditions change.
Does a Trakend permit satisfy the owner's or OSHA's permit rules?
The tool records the permit and enforces the steps described here. Whether that meets a particular owner's program or a regulation is for you and your safety advisor to confirm.
Can I print the permit?
Yes. Each permit prints or saves as a PDF so it can be posted where the work is happening.
This page is general information about a software tool, not safety or legal advice. The employer is responsible for its permit programs, site-specific hazards, training and compliance.
Related
- Trench and excavation daily log: A daily trench inspection log only your excavation competent person can sign, with after-rain prompts, stop-work on any fail and missed-day warnings.
- Fillable PDF forms: Upload the PDF forms your company already uses, place text, date, checkbox and signature fields on them, and have crews fill them out on a phone.
- Safety dashboard: One company-wide safety screen: incident rates, expiring cards and certifications, cleared operators, sub prequal, chemicals and what needs attention.
- Lockout/tagout (LOTO): Lockout/tagout is the practice of shutting off and locking energy sources before servicing equipment, so it cannot start by accident. Example and mistakes.
- Confined space entry: Free 5-minute confined space toolbox talk: what counts as a confined space, permits, air testing, the attendant, ventilation and rescue.