Home › All features › Feature guide › Trench and excavation daily log

A daily trench inspection log that notices when a day is missed

An open trench has to be looked at by a competent person every day before anyone goes in, and again when conditions change. The inspection is quick. Remembering to do it on day 40, and after the storm on day 41, is what goes wrong. Trakend makes the inspection a daily item with a name on it and speaks up when it does not happen.

Last updated

Day one gets inspected. Day forty is the problem

On the first morning of an excavation everyone is careful. A few weeks in, the inspection sheet is a stack of identical pages signed in the truck, or nothing at all. Rain falls overnight, the spoil pile slumps, and the crew climbs in at seven because the pipe has to go in the ground.

The other weak point is who signs. The inspection belongs to a competent person, someone who can recognize the hazards and has the authority to stop work. On paper, anyone holding the clipboard can sign.

Turning the log on for a job

Not every project digs. In the project's Site Safety tab there is a switch that says the job has trenches or excavations. Turn it on and Trakend starts expecting an inspection on work days, and starts warning about missed ones. Turn it off when the last excavation is backfilled.

Choose the checklist language for the job. The inspection uses Trakend's stock trench and excavation checklist, which comes in English and Spanish.

What an inspection records

Only a designated competent person can sign

Trakend checks who is signing. The log accepts a signature only from someone who holds a current excavation competent person designation in their employee safety record. If nobody on the company list has that designation, the screen says so and the inspection cannot be signed until the company designates someone.

A safety manager with edit rights can enter an inspection on behalf of the competent person, for example from a paper sheet, and the log shows who typed it in.

Rain and missed days

The same weather feed that fills in the daily report watches for rain at the jobsite. When rain has been measured since the last after-rain inspection, the log prompts for a new one before work continues.

If a work day passes with no inspection, it shows as missed on the project's Site Safety tab and on the company Safety Dashboard, and a reminder goes out in the morning. A failed inspection sends its own notification, so the office knows a trench was stopped and why.

Who uses it and what it replaces

The competent person, often a foreman or superintendent, does the inspection on a phone at the edge of the excavation. Safety managers and project managers watch the missed-day list. Utility, site work and excavation contractors use it every day. General contractors turn it on for the weeks the job is open.

It replaces the pad of paper inspection sheets and the hope that somebody remembered. It does not classify your soil, design your protective system or decide whether a trench is safe to enter. Those are the competent person's judgments. The trench log is part of Site Safety on every Trakend plan. For crew material, see the free trenching and excavation toolbox talk and the trenching JHA template.

Frequently asked questions

Who is allowed to sign the trench inspection in Trakend?

Only a person with a current excavation competent person designation on their safety record. The company makes that designation. Trakend only checks that it exists and has not expired.

How does Trakend know it rained?

It uses measured rainfall for the project's location from the same weather feed as the daily report. If rain has fallen since the last after-rain inspection, it prompts for another.

What happens when an item fails?

The inspector must enter a corrective action, the inspection is marked Stop, and a notification is sent. Work in the excavation resumes when your competent person says so.

Is the checklist available in Spanish?

Yes. The stock trench and excavation checklist has English and Spanish versions, and you choose the language for each job.

This page is general information about a software tool, not safety or legal advice. The employer and its competent person are responsible for excavation safety, site-specific hazards, training and compliance.

Related

Start a 30-day free trial · Pricing · Features · Free templates · Guides · By trade · By state