Construction software for tile contractors
Tile is a finish people study up close for decades. Trakend helps tile contractors record substrate conditions, layout approvals and mock-ups, keep dust controls documented, and bill the prep work nobody planned for.
Last updated
Layout, flatness and approvals
Tile shows every flaw underneath it. Walls that are not plumb, floors that are not flat, and slopes that do not drain all become the tile setter's problem. Large-format tile makes it worse, because it needs a flatter surface than most slabs are built to.
Then there is layout. Where the cuts fall, how grout joints line up, which pattern runs which way. If layout and mock-ups are not approved before setting, the setter may be tearing out finished work.
JHAs and toolbox talks for tile setters
Start from the flooring and tile JHA. Cutting tile creates silica dust, so read the silica dust talk too.
- Silica dust from saws and grinders: wet saws and vacuums
- Wet saws and electricity: GFCI on every cord
- Kneeling all day: knee pads and breaks
- Mixing thinset and grout: dust and skin contact
- Lifting boxes of tile and large-format panels
- Sealers and epoxy grouts: ventilation and the SDS
What goes on a tile daily report
Room, stage and approvals.
- Setters, finishers and hours
- Areas prepped, waterproofed, set, grouted and sealed, by room
- Substrate conditions and flatness problems, with photos and a straightedge in the picture
- Waterproofing and flood tests in showers and wet areas
- Layout and mock-up approvals: who approved, and when
- Tile deliveries, lot numbers and shade
- Protection installed, and damage by others
Approvals on record
Take a photo of the dry layout or mock-up, and write down who approved it in the daily report. For shower pans and wet areas, use a checklist with pass or fail on the flood test and a sign-off. Samples and mock-ups also go through the submittal register, with status and reviewer.
Prep work, T&M and pay apps
Extra floor and wall prep is the main extra: self-leveling, grinding high spots, floating walls. Get agreement first, track it on a T&M ticket with labor and material, and have it signed on your phone before the tile covers it.
Bill by room or area from the schedule of values, with stored materials for tile on site and retainage tracked on each line.
Crews and equipment
Setters clock in on a phone or kiosk tablet against the job's GPS fence. Track wet saws, mixers, grinders, vacuums and leveling tools, with service reminders.
Pricing for a field-heavy company
Plans start at $299 a month for 5 office and field users and go up to $2,499 a month for unlimited users, with every feature on every plan. Time-clock-only crew and subcontractors on your projects do not count as users. There is no setup fee, and tile contractors get a 30-day free trial. See pricing.
Frequently asked questions
How do I record a layout approval?
Photograph the layout or mock-up and note who approved it and when in that day's report. The report is saved by date and can be emailed as a PDF.
Can I document flood tests in showers?
Yes. Record them in the daily report or use a checklist with pass, fail or N/A items, photos and a sign-off.
How do I bill for extra floor leveling?
Record labor and material on a T&M ticket, get it signed on screen, and convert it to a change order.
Related
- Flooring and tile: Free flooring and tile JHA: floor prep and grinding dust, asbestos in old flooring, wet tile saws, adhesives and solvent vapors, and knee strain.
- Flooring contractors: Software for commercial flooring contractors: moisture test records, substrate photos, daily reports by area, crew hours, T&M floor prep and pay apps.
- Silica dust exposure: Free 5-minute silica dust toolbox talk: where silica comes from, wet cutting, vacuums, Table 1, respirators, and why you never dry sweep.
- Daily reports: Fill out construction daily reports on a phone: auto weather, crews and man-hours, photos, delays. Finalize the day and email a branded PDF.
- Safety, JHAs & toolbox talks: Digital JHAs with crew sign-in signatures, 89 toolbox talks in English and Spanish, incident reports with OSHA recordable flags, and checklists.
- Change orders & pay apps: Change orders with OH&P markup, field-signed T&M tickets, schedule of values, retainage, and G702/G703-style pay application PDFs.
Start a 30-day free trial · Pricing · Features · Free templates · Guides · By trade · By state