Home › Trades › Electrical contractors
Construction software for electrical contractors
Electrical work runs on drawings that keep changing, gear with long lead times, and crews spread across floors. Trakend keeps the current sheets, the open RFIs, the submittals, the hours and the billing in one app your foremen can use from a lift.
Last updated
Revisions, long-lead gear and a moving schedule
An electrical foreman's day is shaped by things outside the crew's control. A ceiling layout changes and the lights move. A panel schedule is revised. The switchgear slips again. Other trades close up walls before the inspection.
Each of those is a question, a submittal or a change, and each one needs a paper trail. If the trail is a text thread and a marked-up print in the gang box, it will not be there when you need it.
JHAs and toolbox talks for electricians
The electrical JHA template covers the core steps. Add the day's specifics before the crew signs.
- Lockout/tagout and testing for absence of voltage before touching anything. See the LOTO talk
- Arc flash when energizing and testing gear
- Ladders and lifts for overhead rough-in
- Temporary power: GFCI protection and damaged cords across the whole site
- Strains and pinch points on long, heavy wire pulls
- Trenching for underground conduit and duct bank
What goes on an electrical daily report
Electrical work is spread thin across a building, so the daily should say where the crew was and what is now ready for inspection.
- Crew and hours by area or floor
- Work installed: conduit, boxes, wire pulled, devices, fixtures, gear set
- Inspections called and passed: underground, rough-in, above-ceiling, final
- Material deliveries and what is still missing
- Delays: areas not released, other trades in the way, waiting on answers
- Photos of in-wall and above-ceiling work before it is covered
RFIs, submittals and the current set
Drawings upload once and split into sheets. A new revision replaces the old one, so nobody roughs in from last month's lighting plan. From the sheet, drop a pin and send an RFI about that exact spot.
Submittals track status, reviewer and ball-in-court. Enter the needed-on-site date and the lead time for switchgear, fixtures or a generator, and Trakend works out the order-by date and flags the ones running late.
Change orders and stored material on electrical pay apps
Electrical contractors carry a lot of material before it is installed. The pay application bills stored materials on each schedule of values line, along with work completed and retainage. When the owner adds circuits, moves devices or upgrades fixtures, price a change order with separate markups for labor, materials and equipment. Small field changes go on a T&M ticket the superintendent signs on screen.
Crews, hours and tools
Electricians clock in on a phone or the foreman's tablet, against a GPS fence for each job. The equipment list keeps track of lifts, benders, tuggers, threaders and testers, owned and rented, with service reminders and rental return dates.
Flat pricing, every feature
You pay by plan, not by head: Starter is $299 a month for 5 users, Team is $749 for 20, Business is $1,299 for 50, Pro is $1,999 for 100, and Unlimited is $2,499. Nothing is held back for higher plans, and workers who only clock in are free. Electrical contractors can start with a 30-day free trial. See pricing.
Frequently asked questions
Can I track switchgear and fixture lead times?
Yes. On each submittal enter the needed-on-site date and the lead time in days. Trakend calculates the order-by date and flags items that are late or due within a week.
Can electricians see the latest drawings on a phone?
Yes. Sheets open in the web app and in the iPhone, iPad and Android apps. A newly uploaded revision becomes the current sheet and older versions stay in the history.
Can I bill stored materials?
Yes. Pay applications bill each schedule of values line by percent complete or dollar amount, including stored materials, with retainage.
Related
- Electrical: Free electrical JHA: de-energize and lock out, test for absence of voltage, conduit and wire pulls, temporary power with GFCI, and safe energizing.
- Electrical safety: Free 5-minute electrical safety toolbox talk for all trades: GFCIs, cords, power lines, lockout and what to do if someone is being shocked.
- Lockout/tagout (LOTO): Free 5-minute lockout/tagout toolbox talk: energy sources, one lock per person, verifying zero energy, and safe restart, with a sign-in sheet.
- RFIs & submittals: Track RFIs and submittals with auto-numbering, ball-in-court, due dates, lead-time order-by dates, drawing pins and combined PDF packages.
- Plans & drawings: Upload a drawing set once. Trakend splits it into sheets, reads sheet numbers, tracks revisions, and lets your team mark up and measure.
- Change orders & pay apps: Change orders with OH&P markup, field-signed T&M tickets, schedule of values, retainage, and G702/G703-style pay application PDFs.
Start a 30-day free trial · Pricing · Features · Free templates · Guides · By trade · By state
