Construction software for demolition contractors
Demolition is planned before the first swing: the survey, the shutoffs, the hazardous material report. Trakend keeps those records with the job, along with daily progress, load counts and the surprises found inside the walls.
Last updated
Unknowns behind every wall
Demolition contractors bid from drawings of a building that has been changed for decades. Behind the finishes there may be live utilities, hidden structure, extra layers of flooring, or materials that have to be tested before anyone touches them.
Each discovery stops work in that area and usually changes the price. The demolition contractor who photographs and reports it the same day gets paid for it. The one who works through it does not.
Demolition JHAs and pre-work records
OSHA 29 CFR 1926 Subpart T requires an engineering survey before demolition starts. The demolition JHA builds on that.
- Unplanned collapse: follow the sequence and never undermine supports
- Live utilities: shutoffs confirmed and locked out
- Asbestos and lead: survey first, stop on suspect material
- Falling debris: drop zones, chutes and overhead protection
- Silica dust from breaking concrete: see the silica talk
- Floor openings created by the work itself
What goes on a demolition daily report
Before photos are part of the report, not an extra.
- Crew, operators and hours
- Areas demolished, by floor and gridline
- Loads hauled, by material type, with dump tickets photographed
- Salvage set aside for the owner
- Utilities found live, and what was done
- Suspect materials found and areas stopped
- Protection installed: barricades, dust walls, floor protection
Keeping the survey, shutoffs and reports with the job
Upload the engineering survey, the hazardous material report and the utility disconnect letters to the project's files so the foreman can open them on a phone. Use a checklist to confirm each utility is off before work starts in an area, with a photo of the lock or the capped line.
Change orders for hidden conditions
The common ones are extra layers of flooring or roofing, concrete thicker or more heavily reinforced than shown, unforeseen hazardous material, and added selective demolition for other trades. Send photos the same day, and put the extra labor, equipment and disposal on a T&M ticket that the superintendent signs on screen.
Signed tickets convert into change orders with your markups. Bill progress by area on a G702/G703-style pay application with retainage.
Machines, attachments and crews
Track excavators, skid steers, breakers, shears, saws, dust collectors and dumpsters, with service reminders and rental return dates. Crews clock in by phone or kiosk tablet inside the GPS fence for the job.
Pricing for a field-heavy company
Plans start at $299 a month for 5 office and field users and go up to $2,499 a month for unlimited users, with every feature on every plan. Time-clock-only crew and subcontractors on your projects do not count as users. There is no setup fee, and demolition contractors get a 30-day free trial. See pricing.
Frequently asked questions
Where do I keep the engineering survey and asbestos report?
Upload them to the project's files. Anyone with access to the project can open them on a phone or computer.
Can I track loads hauled off site?
Record load counts and material types in the daily report and attach photos of the dump tickets.
How do I get paid for hidden conditions?
Document the condition with photos the day it is found, record the extra work on a signed T&M ticket, and convert it into a change order.
Related
- Demolition: Free demolition JHA: engineering survey, asbestos and lead checks, utility shutoff, drop zones, top-down sequence, silica dust and debris load-out.
- Concrete saw cutting and coring: Free concrete saw cutting and coring JHA: scanning for embeds, silica dust controls under Table 1, kickback, slurry, and safe removal of cut sections.
- Silica dust exposure: Free 5-minute silica dust toolbox talk: where silica comes from, wet cutting, vacuums, Table 1, respirators, and why you never dry sweep.
- Lockout/tagout (LOTO): Free 5-minute lockout/tagout toolbox talk: energy sources, one lock per person, verifying zero energy, and safe restart, with a sign-in sheet.
- Daily reports: Fill out construction daily reports on a phone: auto weather, crews and man-hours, photos, delays. Finalize the day and email a branded PDF.
- Change orders & pay apps: Change orders with OH&P markup, field-signed T&M tickets, schedule of values, retainage, and G702/G703-style pay application PDFs.