Construction software for concrete contractors
Concrete work is decided on pour day, and so is the paperwork. Trakend gives concrete crews one app for the JHA before the pour, the daily report after it, the hours in between, and the tickets and pay apps that get the work paid for.
Last updated
Pour day does not wait for paperwork
A concrete crew can place a few hundred yards before lunch and be on another site tomorrow. The record of what happened, such as who was there, what the weather did, when the trucks showed up and what the inspector said, usually lives in a foreman's head and a stack of batch tickets on the dash.
When a slab cracks, a break comes back low, or the general contractor disputes a standby charge, that record is all you have. It needs to be written the same day, by the person who was there, in a couple of minutes.
JHAs and toolbox talks for concrete crews
Concrete crews face the same handful of hazards on every pour. Start from the concrete pour and finishing JHA and add what is different today.
- Wet concrete burns from mix trapped in boots and gloves
- Pump hose whip when the line is started or cleared
- Backing ready-mix trucks and pump outriggers on soft ground
- Impalement on uncapped rebar
- Silica dust when saw cutting joints, and carbon monoxide from gas trowels indoors
- Heat on summer flatwork: see the heat illness talk
What goes on a concrete daily report
Weather fills in by itself from the job's zip code, with morning and afternoon readings. That matters when someone later asks why you tented, heated or called off a pour. The rest takes a few taps:
- Crews, headcount and hours for form setters, rod busters, placers and finishers
- What was formed, poured, stripped or cured, by area or pour number
- Trucks and yards delivered, pump on site, and any late or rejected loads
- Inspections: rebar, pre-pour, cylinders taken and by whom
- Delays: waiting on other trades, weather, plant problems
- Photos of rebar before the pour, the finished surface and the cure
Clocking in a crew that starts before sunrise
Pour days start early and end when the slab says so. Crews clock in on their own phone or on the foreman's tablet in kiosk mode, where the foreman can punch the whole crew in at once. Each punch is checked against a GPS fence around the job, and overtime rules apply automatically, so a 14-hour pour does not turn into a payroll argument on Monday. Finishers who only use the time clock do not use a paid seat.
Getting paid for extras on concrete work
Concrete extras are small, frequent and easy to lose: pump standby because the site was not ready, a second mobilization, an added thickened edge, winter protection, a re-pour after someone else's damage. Write a T&M ticket on the spot with labor, materials and equipment, and have the superintendent sign it on your phone before you leave.
Signed tickets convert into a change order with your markups. Approved change orders land on the next G702/G703-style pay application, with retainage and stored materials such as rebar and embeds handled on the schedule of values.
Forms, pumps and trowels: equipment to track
Keep owned and rented equipment in one list: pumps, laser screeds, power trowels, vibrators, saws, light towers and form systems. Trakend tracks which job each item is on, service due by date or hour meter, inspection logs and rental return dates, so a rented pump or a set of forms does not sit on a finished job running up a bill.
What Trakend costs
Trakend is a flat monthly price, not a per-user fee: $299 for 5 users, $749 for 20, $1,299 for 50, $1,999 for 100 and $2,499 for unlimited users. Every plan has every feature and unlimited storage (fair use). Crew members who only use the time clock are free. Concrete contractors can try it free for 30 days. See pricing.
Frequently asked questions
Can I record pour details like yards placed and truck times?
Yes. Write them in the daily report's work description and materials delivered fields, and attach photos of the batch tickets. They are saved with that date and included in the end-of-day PDF.
Can my foreman get a standby or T&M ticket signed at the pour?
Yes. T&M tickets list labor, materials and equipment and can be signed on screen by the general contractor's superintendent, or you can upload a photo of a signed paper ticket.
Does Trakend have pre-pour checklists?
Yes. Trakend includes ready-made checklist templates, including pre-pour checks, that you can use as they are or copy and edit. Each item is marked pass, fail or N/A with an optional photo.
Related
- Concrete pour and finishing: Free concrete pour and finishing JHA: rebar, ready-mix trucks, pump hose whip, wet concrete burns and power trowels, with controls and a crew sign-in.
- Concrete saw cutting and coring: Free concrete saw cutting and coring JHA: scanning for embeds, silica dust controls under Table 1, kickback, slurry, and safe removal of cut sections.
- Silica dust exposure: Free 5-minute silica dust toolbox talk: where silica comes from, wet cutting, vacuums, Table 1, respirators, and why you never dry sweep.
- Daily reports: Fill out construction daily reports on a phone: auto weather, crews and man-hours, photos, delays. Finalize the day and email a branded PDF.
- Change orders & pay apps: Change orders with OH&P markup, field-signed T&M tickets, schedule of values, retainage, and G702/G703-style pay application PDFs.
- For subcontractors: Daily reports, JHAs, T&M tickets, change orders, pay apps and crew time clock for specialty contractors. Join your GC's projects free.