Home › Guides › Site sign-in sheets
How to do a construction site sign-in sheet
A site sign-in sheet is the record of who was on your jobsite each day and when. It sounds like the simplest form on the job, and it is the one you will want most after an emergency, an injury or a dispute about who was there. This guide shows how to set one up so that people actually use it.
Last updated
How to set up site sign-in
- Decide who has to sign in Everyone who enters the site: your own crew, every subcontractor's workers, delivery drivers who leave their truck, inspectors, owner's representatives and visitors.
- Pick one place Put sign-in at the gate or the trailer, where everyone has to pass it. If the site has more than one entrance, each one needs it.
- Collect only what you need Name, company, time in, time out and a signature. Add a phone number for visitors if you want one.
- Tie it to the site rules Post the PPE rules, the emergency meeting point and the emergency phone number where people sign in. For first-time visitors, signing in is the moment to give the site orientation.
- Make sign-out part of the routine A sheet with no sign-out times cannot tell you who is still on site. Remind crews at the end of the shift, and have foremen close out anyone who forgot.
- Collect and file it every day At the end of the day, review the sheet, fix obvious gaps, and file it with that day's daily report.
What a sign-in sheet is for
- Emergencies. If you have to evacuate, the sign-in sheet is your headcount list at the meeting point.
- Security. You know who was on site, and unknown people stand out.
- The daily report. Headcounts by company come straight from the sheet.
- Disputes. When a subcontractor says they had eight workers on site and you counted four, the sheet settles it.
- Incidents. After an injury or property damage, you can show who was present and when they arrived.
- Orientation. It is a simple check that everyone who came on site was told the rules.
What to put on the sheet
Keep it short. A long form at the gate means a line at the gate, and people start skipping it.
| Field | Why it matters |
|---|---|
| Date and project | One sheet per project per day |
| Printed name | Signatures alone are often unreadable |
| Company or trade | Headcount by subcontractor for the daily report |
| Time in | When they arrived |
| Time out | Who is still on site, and how long each person was there |
| Signature | Confirms the person signed in and saw the posted site rules |
Workers, subcontractors and visitors
Your own crew and your subcontractors' crews sign in every day. Some contractors let a foreman sign in a whole crew at once. That is faster, but the foreman then owns the accuracy of the list.
Visitors are different. They do not know the site. Someone should meet them, make sure they have the required PPE, tell them where they can and cannot go, and show them the emergency meeting point. Record who they came to see.
Paper sheets and their problems
A clipboard at the gate works on a small job. On a busy site it has known weak points: the sheet gets wet or blows away, handwriting cannot be read, people sign in and never sign out, and yesterday's sheet is in a truck when you need it. One person signing for six friends is hard to spot.
If you stay with paper, bring the clipboard inside every night, start a fresh dated sheet every morning, and take a photo of each day's sheet so there is a copy off site.
Sign-in sheets are not time cards
A sign-in sheet shows who was on site. It is not built for payroll. Hours for pay should come from a time clock or time cards that handle breaks, overtime and approvals. The two records are useful together, because each one can be checked against the other. If your site collects any personal information at the gate, collect only what you need and keep the sheets where only the people who need them can see them.
How long to keep them
Keep sign-in sheets with the rest of the project records, for as long as your contract and your company's record policy require. They are small, and they are often the only record of who was present on a given day.
Site sign-in in Trakend
Trakend has a site sign-in built for this. Each project gets a QR code that you post at the gate. The same code works every day. Workers and visitors scan it with their phone camera and sign in with their name, their company and a signature on the screen. They do not need an account or an app. Each sign-in records the time in and the time out.
The superintendent sees who has signed in for the day, and the sign-ins can be included with that day's daily report. Site sign-in visitors never count as paid users. Crew hours for payroll come from the separate time clock. See Trakend safety features or start a 30-day free trial.
Frequently asked questions
Who should sign in at a construction site?
Everyone who enters: employees, subcontractor workers, inspectors, owner and design team representatives, and visitors. Delivery drivers who get out of their vehicle should sign in too.
Is a site sign-in sheet required?
It depends on your contract and the owner's site rules. Many general contractors require it for security and emergency headcounts. Even where it is not required, it is a cheap and useful record.
Can a foreman sign in for the whole crew?
Some sites allow it. If you do, the foreman should list every person by name and is responsible for the list being right.
Is a sign-in sheet the same as a toolbox talk sign-in?
No. A site sign-in records who entered the site. A toolbox talk sign-in records who attended a specific safety meeting. Keep both.
Related
- Safety, JHAs & toolbox talks: Digital JHAs with crew sign-in signatures, 89 toolbox talks in English and Spanish, incident reports with OSHA recordable flags, and checklists.
- Time clock: Crew time clock with GPS geofences, jobsite kiosk, PIN sign-in, lunch rules, overtime presets, pay-period approval and payroll file exports.
- How to write a daily report: What goes in a construction daily report, who writes it, and how to do it in a few minutes a day. A plain-English guide with a step-by-step checklist.
- How to run a toolbox talk: How to run a toolbox talk: pick the topic, keep it to five minutes, get the crew talking, and document who attended. A simple guide for foremen.
- Emergency action plan: Free 5-minute emergency action plan toolbox talk: site address, alarms, exits, the meeting point, first aid, and who calls 911.
Start a 30-day free trial · Pricing · Features · Free templates · Guides · By trade · By state