Home › Trades › Masonry contractors
Construction software for masonry contractors
Masonry is counted in units laid and controlled by weather, scaffold and inspections. Trakend records each day's wall footage, grout lifts, temperatures and crew hours, and keeps the safety paperwork for scaffolds and silica with the job.
Last updated
Weather, scaffold and special inspections
Masons cannot lay in the rain, and hot and cold weather each bring their own procedures for mortar and grout. Walls need bracing until the structure ties them in. Grouted walls need an inspector there before the cells are filled. A mason contractor's day is planned around all three.
When the schedule slips, a record of temperatures, rain days and inspector no-shows is what protects you.
JHAs and toolbox talks for masons
The masonry JHA covers the limited access zone and bracing rules in OSHA 1926.706.
- Wall collapse before bracing or tie-in
- Scaffold erection, inspection and loading: see the scaffolding JHA
- Silica dust from cutting block and brick: wet saws and vacuums. See the silica talk
- Lifting heavy block, all day
- Cement burns from mortar and grout
- Forklifts and mixers
What goes on a masonry daily report
Weather is recorded automatically with high and low temperatures, which is the record you want for cold and hot weather work.
- Masons, tenders and operators: headcount and hours
- Walls laid, by location, with course height reached
- Grout lifts poured, and the inspector present
- Rebar, embeds and flashing installed before grouting
- Block, brick, mortar and grout deliveries
- Weather protection used: tenting, heat, covering walls
- Photos of reinforcing and cleanouts before grout
Scaffold and bracing records
Use a checklist for the competent person's scaffold inspection before each shift, with pass, fail or N/A on each item and a photo where something is wrong. The crew's JHA is signed on a phone each morning. Both are saved by date, next to the daily report, so the full record for any day is one PDF.
Change orders and pay apps for masonry
Typical masonry extras include added openings, changes to bond or coursing, embedded items that arrive late, winter protection the contract did not cover, and cleaning walls after other trades. Write a T&M ticket for the small ones and get it signed.
Bill by wall or by elevation on the schedule of values. Stored materials, such as block, brick and stone delivered to the site, can be billed on the pay application, with retainage tracked on each line.
Crews and equipment
Masons and tenders clock in on a phone or a kiosk tablet, checked against the GPS fence for the job. Track mixers, saws, forklifts, grout pumps and scaffold, with service reminders and rental return dates.
What Trakend costs
Trakend is a flat monthly price, not a per-user fee: $299 for 5 users, $749 for 20, $1,299 for 50, $1,999 for 100 and $2,499 for unlimited users. Every plan has every feature and unlimited storage (fair use). Crew members who only use the time clock are free. Masonry contractors can try it free for 30 days. See pricing.
Frequently asked questions
Can I record temperatures for cold weather masonry?
The daily report fills in the high and low temperature, wind and precipitation for the date from the project's zip code, with morning and afternoon readings. Add notes on the protection you used.
Can I document scaffold inspections?
Yes. Use an inspection checklist with pass, fail or N/A items, photos and a sign-off. It is saved to the project by date.
Can I bill for block and brick stored on site?
Yes. Pay applications include stored materials on each schedule of values line.
Related
- Masonry: Free masonry JHA: limited access zones, wall bracing, mortar and grout, lifting block, wet cutting for silica, and working from scaffolds.
- Scaffolding: Free scaffolding JHA: erection under a competent person, shift inspections, guardrails and planking, rolling scaffolds, and dismantling.
- Silica dust exposure: Free 5-minute silica dust toolbox talk: where silica comes from, wet cutting, vacuums, Table 1, respirators, and why you never dry sweep.
- Safety, JHAs & toolbox talks: Digital JHAs with crew sign-in signatures, 89 toolbox talks in English and Spanish, incident reports with OSHA recordable flags, and checklists.
- Daily reports: Fill out construction daily reports on a phone: auto weather, crews and man-hours, photos, delays. Finalize the day and email a branded PDF.
- Change orders & pay apps: Change orders with OH&P markup, field-signed T&M tickets, schedule of values, retainage, and G702/G703-style pay application PDFs.
Start a 30-day free trial · Pricing · Features · Free templates · Guides · By trade · By state
