Construction software for fire protection contractors
Sprinkler work is design, coordination and tests that an inspector has to witness. Trakend tracks the submittals, puts the current drawings on the fitter's phone, and keeps every hydrostatic test and inspection with the job.
Last updated
Design-build, with an inspector at every step
Most fire sprinkler contractors design what they install. That means shop drawings and calculations have to be approved before pipe is fabricated, and the authority having jurisdiction decides when you are done.
In the field, sprinkler mains compete with duct, cable tray and structure for the same ceiling space. A late ceiling change means moved heads and re-work after everything was inspected.
JHAs and toolbox talks for sprinkler fitters
Sprinkler fitting shares hazards with plumbing and mechanical work. The plumbing JHA and the ladder work JHA are good starting points.
- Overhead pipe from ladders and scissor lifts
- Lifting and hanging long, heavy pipe
- Hydrostatic and air tests: stay clear of caps and fittings
- Cutting, grooving and threading machines
- Welding and torch work under a hot work permit
- Working on systems that protect an occupied building: impairments and fire watch
What goes on a fire protection daily report
Area, system and test.
- Fitters and hours, by floor or zone
- Mains, branch lines and heads installed, by area
- Fabricated pipe deliveries, and what is short
- Tests: hydrostatic pressure and duration, air tests, and who witnessed them
- Inspections: underground flush, rough, above-ceiling, final
- Clashes with other trades and ceiling changes, with photos
- System impairments and when the system was put back in service
Submittals and drawings
Shop drawings, hydraulic calculations and product data go through the submittal register, with status, reviewer and revision number on each. Upload approved drawings as project sheets so fitters open the current version on a phone, and a revised sheet replaces the old one. When a main will not fit past a beam or a duct, pin an RFI to the spot.
Change orders and billing
Sprinkler change orders usually come from ceiling and wall changes, tenant layouts and added coverage. Price them with separate markups for labor and material. Head relocations after inspection are a good fit for T&M tickets signed on screen.
Bill the contract by system or floor from the schedule of values: design, underground, fabrication, rough-in, trim and testing. Stored materials and retainage are handled on the pay application.
Crews and tools
Fitters clock in on a phone or kiosk tablet inside the job's GPS fence. Track lifts, threaders, groovers, test pumps and welders, with service and rental return reminders.
Flat pricing, every feature
You pay by plan, not by head: Starter is $299 a month for 5 users, Team is $749 for 20, Business is $1,299 for 50, Pro is $1,999 for 100, and Unlimited is $2,499. Nothing is held back for higher plans, and workers who only clock in are free. Fire protection contractors can start with a 30-day free trial. See pricing.
Frequently asked questions
Can I keep hydrostatic test records with the project?
Yes. Record the pressure, duration and witness in the daily report's inspections field with photos of the gauge, or use a checklist for a signed record. You can also upload the signed test certificate to the project's files.
Can fitters see approved shop drawings in the field?
Yes. Upload them as sheets. They open in the web app and the iPhone, iPad and Android apps, and new revisions replace old ones.
Can I bill design and fabrication before installation?
Set up schedule of values lines for design and fabrication, and bill stored materials for delivered pipe, as your contract allows.
Related
- Plumbing: Free plumbing JHA: isolating water and gas, soldering and solvent cement, overhead and in-wall work, crawl spaces and sewage, and pressure tests.
- Ladder work: Free ladder JHA: choosing and inspecting the ladder, 4-to-1 setup, 3 feet above the landing, three points of contact, and safe take-down.
- Fire prevention and extinguisher use: Free 5-minute toolbox talk on jobsite fire prevention and the PASS method for extinguishers: hot work, fuel storage, exits and when to get out.
- RFIs & submittals: Track RFIs and submittals with auto-numbering, ball-in-court, due dates, lead-time order-by dates, drawing pins and combined PDF packages.
- Plans & drawings: Upload a drawing set once. Trakend splits it into sheets, reads sheet numbers, tracks revisions, and lets your team mark up and measure.
- Change orders & pay apps: Change orders with OH&P markup, field-signed T&M tickets, schedule of values, retainage, and G702/G703-style pay application PDFs.
Start a 30-day free trial · Pricing · Features · Free templates · Guides · By trade · By state