Home › All features › Feature guide › Finalize Day
Finalize Day: one PDF and one email for the whole day
At the end of a shift the day's paperwork is scattered: a daily report, two or three JHAs, a toolbox talk, maybe an incident report. Finalize Day pulls all of it into a single PDF with your logo, files it in the project and emails it to the people who are supposed to get it. It takes one tap.
Last updated
The evening chore it removes
On many jobs someone in the office spends the first hour of every morning building yesterday's package. They chase the superintendent for the report, find the sign-in sheets, scan them, merge the files and email the owner's representative. If that person is out, the package does not go. After a few weeks there are gaps, and gaps are what the other side points to in a dispute.
The contract usually says who gets a daily report and when. Finalize Day makes meeting that a habit and not a project.
What goes into the bundle
- The day's daily report: weather, crews and man-hours, work performed, deliveries, visitors, delays and notes.
- Photos attached to the day.
- Every JHA for that date, with the crew sign-in signatures.
- Toolbox talks held that day, with the signed attendance sheet.
- Incident and near-miss reports from that day.
- Completed checklists, if the project is set to include them.
- The site sign-in sheet at the bottom of the daily report, if the project is set to include it.
Who gets the email
Each project has its own distribution list, set in project settings. A typical list is the owner's representative, the architect, the general contractor's PM and your own office. When the day is finalized, Trakend builds the PDF on the server with your company logo and colors, saves a copy in the project's Files, and emails it to that list.
Big days make big files. If the bundle is over 10 MB, the email carries a download link in place of an attachment, so it does not bounce off someone's mail server.
Proof it was delivered
The finalize panel lists every recipient with a status: Delivered, Sending or Failed. If an address fails, fix it and press Resend. If something was added to the day after it went out, Finalize again sends an updated bundle. You are not left guessing whether the owner received Tuesday's report.
Locking the day
A project can be set to lock after finalize. Once a locked day is finalized, the daily report and its photos are read-only for everyone, including managers. To change something, a person with permission has to unfinalize the day first, on purpose. That gives the record weight: what the owner received is what is on file.
Finalizing is a permission. By default the people who approve daily reports, such as the superintendent and the PM, can finalize. Foremen and workers write their own reports and submit them.
How it fits the rest of the day
The foreman or superintendent fills out the daily report on a phone during the shift. The crews sign their JHAs in the morning with the JHA builder. At the end of the day one person reviews and taps Finalize Day. The office does nothing unless a delivery fails.
It replaces the scan-and-merge routine, the shared folder of daily PDFs named by hand, and the email that starts with 'please see attached'. Finalize Day is part of daily reports and is included on every plan. Maya can draft the day's paperwork, but she never finalizes or sends it. A person does that.
Frequently asked questions
What does Finalize Day send?
One branded PDF containing the day's daily report with photos, JHAs, toolbox talks and incident reports, plus checklists and the site sign-in sheet if the project is set to include them.
Who receives the end-of-day email?
The project's distribution list, which you set per project. A copy of the PDF is also saved in the project's Files.
What if the PDF is too large to email?
Bundles over 10 MB are sent as a download link instead of an attachment.
Can a finalized day be changed?
If the project uses lock after finalize, the day is read-only until someone with permission unfinalizes it. Without the lock, you can edit and finalize again to send an updated bundle.
Can I see whether the email arrived?
Yes. The finalize panel shows Delivered, Sending or Failed for each recipient, with a Resend button.
Related
- Daily reports: Fill out construction daily reports on a phone: auto weather, crews and man-hours, photos, delays. Finalize the day and email a branded PDF.
- JHA builder: Build a job hazard analysis on a phone: job steps, hazards, controls, PPE, permits and training, then collect crew signatures with times in and out.
- Toolbox talk sign-in: Pick one of 89 toolbox talks in English or Spanish, hold the meeting, and have the crew sign on a phone. The PDF keeps the talk and signatures together.
- Weather and delay log: Weather fills into each daily report from the project zip code, with morning and afternoon readings, plus a weather-impact flag with hours lost.
- Photos: Jobsite photos that sort themselves by day or by daily report, with the date taken, GPS, tags, markups and comments. Download any set as a zip.
- Daily report: A construction daily report records each day on site: weather, crews, hours, work done, deliveries and delays. Example, mistakes and related terms.
Start a 30-day free trial · Pricing · Features · Free templates · Guides · By trade · By state
