Cost codes are the labels that let you compare one job with another and the estimate with the result. Trakend keeps a company-wide code library, copies it into each project, and puts the same codes on every document that carries money.
Last updated
Three people, three code lists
The estimator prices the job in one set of categories. The project manager tracks it in another. Accounting posts bills to a third. Each list makes sense to its owner, and none of them line up. So when someone asks whether site concrete made money across the last five jobs, the honest answer is that nobody knows.
Small differences do the damage. One invoice is coded 03-300, another 03300, another just concrete. A report then shows three lines where there should be one.
The company library
In Settings, a company keeps its master list of cost codes. You do not have to start from a blank page.
- Built-in presets to start from: a full CSI list, a common 16-division list, and lists for civil, MEP and residential work.
- CSI divisions can be switched on or off as a block, so an earthwork contractor is not scrolling past finishes and specialties.
- The library is laid out to match the code structure common in construction accounting packages, which helps when numbers move between systems.
- Access is its own permission. Only people granted the Cost Code Templates permission can change the company list.
Into each project
On a project's budget, choose Apply company template. Merge adds the company codes to what the project already has. Replace swaps the project's list for the template. You can still add a code that only this job needs.
Trakend tidies codes as they are saved. Letters become capitals, stray spaces at the ends are removed and spaces inside a code become hyphens. That simple clean-up stops the same code from splitting into two rows.
Every place a code is used
- Budget lines, with a budget amount or a quantity and unit cost.
- Purchase orders, on the order or on each line.
- Vendor invoices, line by line, along with a cost type: labor, material, equipment, subcontract or other.
- Employee expenses and receipts.
- Subcontractor change orders, which count as committed cost on their code.
- Schedule of values lines, so billing can be compared with cost.
Nothing falls through uncoded
People forget to pick a code. Trakend does not drop those costs. They are totalled in a row for costs with no cost code, which still counts toward the project total and gives the office a short list to fix. In job costing, the same codes show budget, committed, spent, projected and remaining.
Who sets them up, and what they replace
An owner, controller or senior project manager usually sets the company list once. Project managers apply it job by job. Field staff see codes only where they need to pick one, for example on an expense. It replaces the code list taped to a monitor and the lookup tab in a spreadsheet. If the idea is new, the glossary explains what a cost code is with an example.
Frequently asked questions
Do I have to use CSI codes?
No. The presets follow CSI divisions because many contractors use them, but you can turn divisions off and add your own codes.
Can each project have different codes?
Yes. A project starts from the company template and can add codes of its own.
What happens to a cost with no code?
It still counts in the project total and is shown in a separate row for costs with no cost code until someone codes it.
Who can edit the company code list?
People with the Cost Code Templates permission. An admin decides who that is.
Related
- Budget: Set a job budget by cost code, then watch committed, actual and remaining money update as purchase orders, invoices and expenses are approved.
- Job costing: See budget, committed, spent, projected and remaining cost for every cost code on a job. Actual cost comes from approved invoices, expenses and rentals.
- Purchase orders: Write purchase orders with line items and cost codes, get them approved, email the PDF to the vendor, and match vendor invoices against each order.
- Vendor invoice approval: Upload a vendor bill, let Maya read it, code each line to a cost code, send it to the project manager for approval and track it through to paid.
- Schedule of values: Build a schedule of values by hand or from your cost-code budget, set retainage per line, get it approved once, and bill from it every month.
- Cost code: A cost code is a short code that sorts every job cost into a category of work, so budget and actual cost can be compared. Example and mistakes.
Start a 30-day free trial · Pricing · Features · Free templates · Guides · By trade · By state