Construction software for roofing contractors
Roofing is weather, fall protection and proof. Trakend gives roofing crews a daily report that records the weather by itself, a JHA the crew signs before going up, and photos tied to the date for every section of roof.
Last updated
Weather days and warranty questions
A roofing schedule is a weather forecast. Rain, wind and temperature decide whether the crew works, what they can install, and whether an open section has to be dried in before they leave. When the job runs long, you need to show which days were lost and why.
Years later, a leak call turns into a search for what was installed where, and what the deck looked like before it was covered. If the photos are on a former employee's phone, you are guessing.
Fall protection and roofing JHAs
Roofing falls are covered by OSHA 29 CFR 1926 Subpart M. The roofing JHA lays out the steps, and the crew should decide the fall protection system for each roof area before anyone climbs.
- Edges, skylights and roof openings
- Ladder and hoist access: see the ladder safety talk
- Torch work, kettles and the fire watch afterward
- Tear-off debris and the drop zone below
- Heat on a dark roof in summer
- Wind, when handling sheets of insulation and membrane
What goes on a roofing daily report
Weather is filled in automatically from the job's zip code, with temperature, wind and rain for the morning and the afternoon. You can flag a weather delay with the hours lost.
- Crew, headcount and hours
- Squares torn off and installed, by roof area
- Deck condition found, and any deck replaced
- How the roof was left: dried in, tied in, temporary seals
- Material loaded to the roof and deliveries
- Photos: deck, insulation layers, flashing details, end-of-day tie-ins
Hours on jobs that move fast
Roofing crews can be on three buildings in a week. Each job has a GPS fence, and workers pick the job when they punch in on a phone or on the foreman's tablet. The foreman can punch the whole crew in at once and start and end the crew lunch. Roofers who only use the time clock do not use a paid seat.
Deck replacement, T&M and billing
The classic roofing extra is what you find under the old roof: rotted deck, wet insulation, a second roof nobody knew about. Photograph it, write a T&M ticket or unit-price ticket with labor and material, and have the owner's representative or the general contractor sign on your phone before you cover it.
Signed tickets turn into change orders. Bill progress by roof area on a G702/G703-style pay application, including stored materials sitting on the roof or in the yard, with retainage tracked for you.
Equipment on and off the roof
Track kettles, hot-air welders, seamers, generators, hoists, tear-off machines and safety gear such as carts, warning line stands and anchors. Rental lifts and dumpsters have return dates, and Trakend reminds you before they run over.
Flat pricing, every feature
You pay by plan, not by head: Starter is $299 a month for 5 users, Team is $749 for 20, Business is $1,299 for 50, Pro is $1,999 for 100, and Unlimited is $2,499. Nothing is held back for higher plans, and workers who only clock in are free. Roofing contractors can start with a 30-day free trial. See pricing.
Frequently asked questions
Does the daily report record weather automatically?
Yes. Weather for the report date is filled in from the project's zip code, with temperature, wind and precipitation, and separate morning and afternoon readings. You can type over it.
How do I document rotted deck for a change order?
Photograph it in the daily report, write a ticket for the labor and material to replace it, get it signed on screen, and convert the ticket into a change order.
Can I keep progress photos by roof section?
Photos are saved at full resolution by project and date and attach to that day's report. Add a note with the roof area so they are easy to find later.
Related
- Roofing: Free roofing JHA: roof access, fall protection at 6 feet, skylights and openings, tear-off, nail guns, torch work and fire watch, and heat on the roof.
- Fall protection: Free 5-minute fall protection toolbox talk: the 6-foot rule, guardrails, nets and harnesses, anchor points, inspections and floor openings.
- Heat illness prevention: Free 5-minute heat illness toolbox talk: water, rest and shade, easing new workers in, and the signs of heat exhaustion and heat stroke.
- Daily reports: Fill out construction daily reports on a phone: auto weather, crews and man-hours, photos, delays. Finalize the day and email a branded PDF.
- Time clock: Crew time clock with GPS geofences, jobsite kiosk, PIN sign-in, lunch rules, overtime presets, pay-period approval and payroll file exports.
- Change orders & pay apps: Change orders with OH&P markup, field-signed T&M tickets, schedule of values, retainage, and G702/G703-style pay application PDFs.
Start a 30-day free trial · Pricing · Features · Free templates · Guides · By trade · By state