Construction software for painting contractors
Painters are the last trade in and the first to be blamed for the schedule. Trakend helps painting contractors record which areas were ready, which coats went on, and how much touch-up was caused by someone else.
Last updated
Last in line, with no time left
By the time painters get an area, the schedule float is gone. Rooms are released late, other trades are still working overhead, and the finish gets damaged after it is done. Painting contractors lose money in two ways: crews that show up to areas that are not ready, and endless touch-up that was not in the bid.
Both are recoverable if they are documented. Neither is recoverable from memory.
JHAs and toolbox talks for painters
The painting and coatings JHA starts with the safety data sheet for each product.
- Solvent vapors and ventilation: see the HazCom talk
- Airless sprayer injection injuries
- Ladders, lifts and swing stages
- Lead in old paint on repaint and renovation work
- Flammable products and oily rags
- Slips on drop cloths and overspray
What goes on a painting daily report
Area and coat, every day.
- Crew and hours
- Areas prepped, primed, first coat, finish coat, by floor and room
- Products and colors used, with batch numbers when it matters
- Temperature and humidity for exterior and coating work. Weather fills in automatically
- Areas not ready or not released, with photos
- Damage after finish and touch-up done, with photos and hours
Showing an area was not ready
When a painter arrives and the drywall is not sanded, the ceiling grid is not in, or the floor is being ground in the same room, take a photo and note it in the daily report's delays field. Finalize Day emails the report as a PDF to the people on the project's distribution list that evening. Over a job, those reports show exactly how many crew days were lost and why.
Touch-up, T&M and pay apps
Agree with the general contractor on what counts as punch list and what counts as damage by others. For damage, write a T&M ticket with hours and material and get it signed on screen the same day. Signed tickets convert to a change order once and cannot be billed twice.
Bill the base contract from a schedule of values by area or by system, on a G702/G703-style pay application with retainage. Texas statutory lien waiver forms are built in.
Sprayers, lifts and hours
Track sprayers, compressors, lifts and swing stages, owned and rented, with service records and rental return dates. Painters clock in on a phone or a kiosk tablet, inside the GPS fence for the job, and time-clock-only crew are free.
Flat pricing, every feature
You pay by plan, not by head: Starter is $299 a month for 5 users, Team is $749 for 20, Business is $1,299 for 50, Pro is $1,999 for 100, and Unlimited is $2,499. Nothing is held back for higher plans, and workers who only clock in are free. Painting contractors can start with a 30-day free trial. See pricing.
Frequently asked questions
How do I prove an area was not ready for paint?
Take a photo and note it under delays in that day's report. Reports are saved by date, and Finalize Day emails a PDF of the day to the project's distribution list.
Can I bill touch-up caused by other trades?
Yes, if your contract allows it. Record it on a T&M ticket, get it signed on screen, and convert the signed tickets into a change order.
Does Trakend store safety data sheets?
Trakend has an SDS and hazard communication library for the products you use, and the painting JHA template starts with an SDS review.
Related
- Painting and coatings: Free painting and coatings JHA: SDS review and ventilation, lead in old paint, ladders, airless sprayer injection injuries, and oily rag fires.
- Hazard communication (HazCom): Free 5-minute HazCom toolbox talk: safety data sheets, container labels, pictograms, PPE and spills, with discussion questions and a sign-in sheet.
- Ladder safety: Free 5-minute ladder safety toolbox talk: inspection, the 4-to-1 rule, 3 feet above the landing, three points of contact, with questions and sign-in.
- Daily reports: Fill out construction daily reports on a phone: auto weather, crews and man-hours, photos, delays. Finalize the day and email a branded PDF.
- Change orders & pay apps: Change orders with OH&P markup, field-signed T&M tickets, schedule of values, retainage, and G702/G703-style pay application PDFs.
- For subcontractors: Daily reports, JHAs, T&M tickets, change orders, pay apps and crew time clock for specialty contractors. Join your GC's projects free.
Start a 30-day free trial · Pricing · Features · Free templates · Guides · By trade · By state