Construction management software for Arizona contractors
Arizona puts its rules on the contract side of the business. Almost everyone needs a Registrar of Contractors license, lien rights depend on a notice sent within 20 days of starting, and lien waivers must follow the forms written into the statute. Crew time rules are light. Here is how that plays out and how Trakend helps.
Last updated
The preliminary twenty day notice
Under A.R.S. 33-992.01, every person who furnishes labor, professional services, materials, machinery, fixtures or tools must serve a written preliminary twenty day notice as a prerequisite to a valid lien. The only exception is a person performing actual labor for wages. The notice goes to the owner, the original contractor, the construction lender if there is one, and the person you contracted with.
- It must be given no later than twenty days after you first furnish labor, materials or the other items to the jobsite.
- A late notice still counts, but the lien then only covers what was furnished in the twenty days before the notice and afterward.
- The statute includes the form the notice should substantially follow.
- A new notice is needed if the actual price ends up exceeding the estimate in your notice by thirty percent or more.
Lien waivers must follow the statutory forms
A.R.S. 33-1008 contains four waiver and release forms: conditional and unconditional, each for a progress payment and for a final payment. The statute says a waiver and release is unenforceable unless it substantially follows the form for the situation. The unconditional forms carry a required warning that the document is enforceable even if you have not been paid, and that you should use a conditional form if you haven't.
Trakend produces G702/G703-style pay applications from an approved schedule of values, with retainage and change orders carried forward. Its built-in lien waiver forms are the Texas statutory forms, so on Arizona jobs use the A.R.S. 33-1008 forms and keep the signed copies in the project's Files with the pay app.
Your first day on a job starts the twenty-day count. Trakend's daily reports, time clock punches and T&M tickets are dated and tied to the project, so that date is easy to prove.
Registrar of Contractors licensing
The Arizona Registrar of Contractors (ROC) licenses contractors statewide, and its definition of contractor includes subcontractors. The ROC says contractors must be properly licensed before submitting bids. Licenses are issued separately for commercial work and residential work, with dual licenses that cover both, for each trade. The ROC's summary of the handyman exemption is that a license is generally required if labor and materials exceed $1,000 or if a permit is required; A.R.S. 32-1121 has the exact wording.
For a general contractor, that means checking every sub's license class before award. Trakend tracks each subcontractor's certificate of insurance and W-9 and sends reminder emails before a certificate expires.
Overtime, breaks and paid sick time
The U.S. Department of Labor's state table lists no Arizona overtime rule for private employers, and Arizona's own overtime statute, A.R.S. 23-391, covers state and local government employees. Private contractors follow the federal standard: time and a half after 40 hours in a workweek. An Arizona Senate research brief says state labor laws do not regulate employee breaks or lunch periods and leave them to the employer.
Arizona does require earned paid sick time. Under A.R.S. 23-372, employees accrue at least one hour for every 30 hours worked, up to 40 hours a year at employers with 15 or more employees and 24 hours at smaller employers.
In Trakend's time clock, Arizona companies use the Federal preset, with overtime after 40 hours a week. There is no Arizona preset. Lunch rules, rounding and pay periods are settings you choose. Approved timesheets give payroll the hours-worked figure that sick time accrual is based on.
Safety: ADOSH runs a State Plan
Arizona operates its own OSHA-approved State Plan covering most private sector workers. It is run by the Arizona Division of Occupational Safety and Health (ADOSH), part of the Industrial Commission of Arizona. ADOSH has adopted the federal OSHA standards and adds some of its own. Federal OSHA still covers a few exceptions, including Indian reservations.
Trakend's safety tools keep the daily record: JHAs signed by the crew, 89 toolbox talks in English and Spanish with attendance sheets, incident reports with an OSHA recordable flag, and inspection checklists. The daily report fills in the day's high and low temperature from the project's zip code, which matters on an Arizona summer job.
No state prevailing wage
Arizona has no state prevailing wage law. A.R.S. 34-321 says state agencies and political subdivisions may not require public works contracts to pay prevailing wage rates.
Trakend plans are flat monthly prices: $299 for 5 users, $749 for 20, $1,299 for 50, $1,999 for 100 and $2,499 for unlimited users. Every plan includes every feature, and subcontractors you invite and crew who only use the time clock are free. See pricing.
General information, not legal advice — rules change; check the official sources below.
Frequently asked questions
Who has to send a preliminary twenty day notice in Arizona?
Under A.R.S. 33-992.01, every person who furnishes labor, professional services, materials, machinery, fixtures or tools, except a person performing actual labor for wages, must serve it as a prerequisite to a valid lien.
Does Arizona have statutory lien waiver forms?
Yes. A.R.S. 33-1008 has four forms, and a waiver is unenforceable unless it substantially follows the right one.
Does Trakend include Arizona lien waiver forms?
No. Trakend's built-in lien waiver forms are the Texas statutory forms. Arizona contractors can keep signed A.R.S. 33-1008 waivers in the project's Files next to each pay app.
Is Arizona an OSHA State Plan state?
Yes. ADOSH, part of the Industrial Commission of Arizona, runs a State Plan that covers most private sector workers.
Which time clock preset fits Arizona?
The Federal preset, with overtime after 40 hours in a week. Lunch and break rules are set by your company policy.
Sources
- A.R.S. 33-992.01 (preliminary twenty day notice)
- A.R.S. 33-1008 (waiver of lien forms)
- Arizona Registrar of Contractors: License classifications
- A.R.S. 32-1121 (persons not required to be licensed)
- U.S. Department of Labor: state minimum wage and overtime table
- A.R.S. 23-391 (overtime pay for public employees)
- Arizona State Senate issue brief: Labor employment laws
- A.R.S. 23-372 (accrual of earned paid sick time)
- OSHA: Arizona State Plan
- A.R.S. 34-321 (prevailing wage contracts prohibited)
Related
- Change orders & pay apps: Change orders with OH&P markup, field-signed T&M tickets, schedule of values, retainage, and G702/G703-style pay application PDFs.
- Daily reports: Fill out construction daily reports on a phone: auto weather, crews and man-hours, photos, delays. Finalize the day and email a branded PDF.
- Time clock: Crew time clock with GPS geofences, jobsite kiosk, PIN sign-in, lunch rules, overtime presets, pay-period approval and payroll file exports.
- Safety, JHAs & toolbox talks: Digital JHAs with crew sign-in signatures, 89 toolbox talks in English and Spanish, incident reports with OSHA recordable flags, and checklists.
- For subcontractors: Daily reports, JHAs, T&M tickets, change orders, pay apps and crew time clock for specialty contractors. Join your GC's projects free.
Start a 30-day free trial · Pricing · Features · Free templates · Guides · By trade · By state